Your search for ''nvOpzp; AND 1=1 OR (<'">iKO)),' returned 5324 results.

Todd Energy Ltd Deep Well Injection Annual Report 2021-2022

consents 9970-1.2 and 10862-1. page 2 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape, amenity and

Application form 21 05085 2 0 Trustpower Limited 26 Nov 2021

page Office use only Consent Number: Job Number: Date Received: Document Number: New/Renewal/Change: Resource Consent Application - Structures Application is for Excavate, drill, tunnel, disturb or deposit material on the bed of a river or lake (Form 220) Online reference number: CA211151010 Completed on: 26 Nov 2021 Online application terms and conditions are accepted? Yes Consultant/Agent details

Irrigation Water Monitoring Programme Annual Report 2021-2022

common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on

Candyman Trust Annual Report 2021-2022

The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape, amenity and visual effects; c. ecosystems, including effects on plants,

Tamarind Sidewinder Annual Report 2021-2022

and nitrogen oxides were all below levels of concern at the time of sampling. No offensive or objectionable odours were detected beyond the boundary during inspections and there were no complaints in relation to air emissions from the site. During the year, the Company demonstrated an overall high level of both environmental performance and administrative compliance with the resource consents. There was one unauthorised incident recorded by the Council in relation to the Company’s

Groundworkx Taranaki Ltd Biennial Report 2020-2022

1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape, amenity and visual effects; c. ecosystems, including effects on plants, animals, or habitats, whether

McKee Power Plant Consent Monitoring 2021-2022

common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on

Rimu PS Consent Monitoring 2021-2022

quality of the unnamed tributary of the Manawapou River. There were no adverse effects on the environment found as a result of the exercise of the air discharge consent. Ambient air quality monitoring at the site showed that levels of carbon monoxide, combustible gases, PM10 particulates, and nitrogen oxides were all below levels of concern at the time of sampling. No offensive or objectionable odours were detected beyond the boundary during inspections, and there were no complaints in

STDC Closed Landfills Annual Report 2021-2022

then discussed in a separate section (Sections 2 to 8). In each subsection 1 (e.g. Section 2.1) there is a general description of the landfilled site and its discharges, an aerial photograph or map showing the location of the former landfill, and an outline of the matters covered by the water discharge permit. Subsection 2 presents the results of monitoring of the STDC’s activities at each of the sites during the period under review, including scientific and technical data. Subsection 3

NPDC Mangapouri Cemetery Annual Report 2021-2022

implemented in the 2022-2023 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include