OMV NZ Ltd Pohukura Production Station Annual Report 2021-2022

sampling. No offensive or objectionable odours were detected beyond the boundary during inspections and there were no complaints in relation to air emissions from the site. Monitoring commissioned by OMV showed that the relevant New Zealand Workplace Exposure Standards for BTEX constituents were complied with. Ecological assessments voluntarily commissioned by OMV of the intertidal coastal area surrounding the Pohokura site showed that the health of the reefs in the vicinity of the production

Manawa Energy Patea HEP Scheme Annual Report 2021-2022

2 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape, amenity and visual effects; c. ecosystems, including

Todd Petroleum Mining Company Kapuni Production Station Annual Report 2021-2022

Production Station showed that levels of carbon monoxide, combustible gases, PM10 particulates, and nitrogen oxides were all below levels of concern at the time of sampling. No offensive or objectionable odours were detected beyond the boundary during inspections and there were no complaints in relation to air emissions from the site. During the period under review, Todd Petroleum demonstrated an overall high level of both environmental performance and administrative compliance with the resource

Osflo Fertiliser Ltd Monitoring Programme Annual Report 2021-2022

indicated that the Company were in compliance with consent defined conditions on the two occasions they were collected. It is noted that the stormwater facility discharge to surface water, only occurs during significant rainfall events. The facility is allowed noticeable, but not objectionable or offensive odour beyond the boundary of the site. In the past, noticeable odours have been noted during the loading and unloading exercises, when material is agitated, or fresh from the supplier.

Value Timber Supplies Ltd Woodwaste Disposal Annual Report 2021-2022

in the large pre-fill gully was maintained as were the silt controls. There were no discharges of unauthorised wood waste or other materials found at inspection. There were no unauthorised incidents recording non- compliance in respect of this consent holder during the period under review. For reference, in the 2021-2022 year, consent holders were found to achieve a high level of environmental performance and compliance for 88% of the consents monitored through the Taranaki tailored

Port Area Industrial Catchments Hongihongi & Herekawe Annual Report 2021-2022

Section 5 presents recommendations to be implemented in the 2022-2023 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. page 2 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the

SDC Closed Landfills Monitoring Programme Annual Report 2021-2022

‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape, amenity and visual effects; c. ecosystems, including effects on plants, animals, or habitats, whether aquatic or terrestrial; d. natural and physical resources having

Contact Energy Stratford Power Station Annual Report 2021-2022

monitoring results from the Taranaki Combined Cycle (TCC) were within consent defined specifications for the full duration of the monitoring period. The Stratford Peaker Plants (SPP) were stack tested with the resulting analysis indicating compliance with consent defined criteria. The six yearly report, as required by the consent, was provided during December 2020 and is next due in the 2026-2027 year. No odours were noted or communicated during the monitoring period. For reference,

Remediation New Zealand Ltd Waitara Road Facility Annual Report 2021-2022

their significance for the environment. Section 4 presents recommendations to be implemented in the 2022-2023 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to:

Application attachment 5 appendix D Existing Resource Consents Trustpower Limited 26 Nov 2021

Taranaki Regional Council at least 48 hours prior to the commencement of the discharge. 2. That the consent holder shall at all times adopt the best practicable option, as defined in section 2 of the Resource Management Act 1991, to avoid or minimise the discharge of silt or other contaminants onto land arising from the discharge. 3. That the consent holder and staff of the Taranaki Regional Council shall meet as appropriate, and at least once per year, with interested submitters