Concrete Batching Plants Annual Report 2022-2023

Subsequently, mitigation methods have been implemented or are imminent. These include the use of hay bales at the discharge point, installation of a silt fence in the run-off drain and the relocation of aggregate. Sampling will be undertaken again once all mitigation is in place. For reference, in the 2022-2023 year, consent holders were found to achieve a high level of environmental performance and compliance for 878 (87%) of a total of 1007 consents monitored through the Taranaki tailored

Hickman J D 1997 Family Trust Annual Report 2022-2023

Hickman JD 1997 Family Trust (the Trust) operates a road transport depot located on Waitara Road at Brixton, Waitara, in the Waiongana catchment. The operations at this site mainly involve packaged dairy related products. Goods are stored under roofed catchments with the remaining areas being paved or gravel. The site also has a vehicle parts wash facility with wastewater draining to sumps and then to the stormwater system. There is a truck wash onsite that drains to trade waste. This report

Contact Energy Stratford Power Station Annual Report 2022-2023

year under review. The next six yearly report is due in the 2026-2027 year. No odours were noted or communicated during the monitoring period. For reference, in the 2022-2023 year, consent holders were found to achieve a high level of environmental performance and compliance for 878 (87%) of a total of 1007 consents monitored through the Taranaki tailored monitoring programmes, while for another 96 (10%) of the consents a good level of environmental performance and compliance was

STDC Coastal Structure Annual Report 2022-2023

consent. No issues, hazards, or changes from the previous monitoring period were noted in Kaupokonui boulder rip-rap, Caves Beach access ramp or Ōpunake Bay boat ramp. None of the monitored structures were causing definitive adverse effects on the surrounding environments, based on the observations and measurement-based monitoring carried out during the period under review. For reference, in the 2021-2022 year, consent holders were found to achieve a high level of environmental performance and

Total Mobility Operators Taranaki October 2024

required) 06 751 0209 or 027 773 3268 Wheelchair ramp available Wheelchair ramp06 758 0734Freedom Companion Driving Service available Ironside Vehicle Society New Plymouth Pre-booked hoist06 753 6469 assistance available Wheelchair ramp06 278 3933STOPS (Hawera) available www.trc.govt.nz/total-mobility (contains answers to frequently asked questions and forms). transport@trc.govt.nz Costs Level of subsidy per trip 75% Maximum contribution by the Taranaki Regional

Wai iti Beach Retreat Annual Report 2022-2023

Recommendations 18 Glossary of common terms and abbreviations 19 Bibliography and references 21 Appendix I Resource consents held by Wai-iti Motor Camp Limited Appendix II Categories used to evaluate environmental and administrative performance Appendix III Taranaki Regional Council Operative Coastal Plan for Taranaki (Rule 40 Structure maintenance minor alteration or minor extension) page ii Appendix IV Daily effluent volume data (m3) provided by Wai-iti

ANZCO Eltham Ltd Annual Report 2022-2023

Waingongoro catchment. Until May 2014, the site was known as Riverlands Eltham. The plant has an associated wastewater treatment system from which treated effluent is disposed of either to land or to surface water. This report covers the Company’s processing season from October 2022 to September 2023 and describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental performance during the period under review. The report also

Job Description Team Leader Riparian

Special requirements • May be required to work outside normal working hours due to emergency responses by Council or servicing the needs of catchment community groups if required. • Must be able to undertake the physical requirements of the position. • Must be able to operate all-wheel drive vehicles. page Organisational areas of responsibility | Ngā wāhanga whakahaere  Be a team player – Contribute to the greater team and organisational goals by completing

Job Description Data Engineer

Safe and secure • Role model appropriate IT security behaviour. • Ensure data infrastructure security and access controls are developed maintained, and audited. • Ensure appropriate access controls are in place for the protection of sensitive data, noting the requirements of New Zealand legislation, and overseas standards such as GDPR. • Educate users around the basics of security and access • Respond when security is compromised or risks are identified. Projects • Participate

TRC Regional Freshwater Plan for Taranaki

consents. At the same time, there are many activities, such as small riverbed structures or taking small quantities of water, that have only minor adverse effects on the environment. The Plan has been written to allow these activities to be carried out without the need for a resource consent. This will result in reduced costs and bureaucracy. On behalf of the Taranaki Regional Council I would like to thank all those who have participated in the preparation of the Regional Fresh