Your search for 'rainfall' returned 1400 results.

Radnor B hydraulic fracturing report 2018-2019

(if any) of the discharges being monitored. One macroinvertebrate survey was carried out on 26 April 2018 at three surface water monitoring sites in the Piakau Stream. A post-fracturing survey could not be undertaken as the necessary flow conditions were not met within the required timeframe4. 4 A period of up to 10 days is required between rainfall events to meet the necessary flow conditions to enable a robust survey to

Kowhai D hydraulic fracturing report 2018-2019

4 A period of up to 10 days is required between rainfall events to meet the necessary flow conditions to enable a robust survey to be undertaken. page 9 2 Results 2.1 Consent holder submitted data 2.1.1 Kowhai-5 post-fracturing discharge report The conclusions from the Kowhai-5 post-fracturing discharge report are summarised as follows: • A total of three of the eight zones planned were fractured over the period 22 January 2019 to 11 March 2019 at depths

pp1106

Long-Term Plan 2018-2028 (Final draft pending approval)

plan for minor schemes. Rainfall and river levels will be monitored and timely flood warnings issued. page 19 Recreation, culture and heritage Facilitate the continued development and maintenance of Yarrow Stadium and ensure that Tupare, Hollard Gardens and Pukeiti are maintained as regionally significant recreational and heritage amenities. In 2018/2019, continue to provide funding for the ongoing maintenance and upgrade of Yarrow Stadium through the

Long-Term Plan 2018/2028

levels of protection or to the standard set in the relevant asset management plan for minor schemes. Rainfall and river levels will be monitored and timely flood warnings issued. page 19 Recreation, culture and heritage Facilitate the continued development and maintenance of Yarrow Stadium and ensure that Tupare, Hollard Gardens and Pukeiti are maintained as regionally significant recreational and heritage amenities. In 2018/2019, continue to provide funding