the consent holders,
this report also assigns a rating as to each Company’s environmental and administrative performance during
the period under review. The rating categories are high, good, improvement required and poor for both
environmental and administrative performance. The interpretations for these ratings are found in
Appendix II.
For reference, in the 2021-2022 year, consent holders were found to achieve a high level of environmental
performance and compliance for 88% of the
potential problem, the Benjamini-Hochberg False Discovery Rate
(FDR) method was applied to the results of the Mann-Kendall test. Further justification for this statistical
approach can be found in Stark and Fowles (2006).
page
10
4 Results
During the 2018-2019 bathing season, sampling was generally confined to weekdays, with no statutory
holidays included. For these reasons, recreational usage of the waters at the time was generally less
intensive,
compliance by OMV, this report also
assigns them a rating for their environmental and administrative performance during the period under
review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with OMV’s approach to
demonstrating consent compliance in site operations and management including the timely provision of
information to Council (such as contingency
discussing the various details of the performance and extent of compliance by NPDC, this report
also assigns them a rating for their environmental and administrative performance during the period under
review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with NPDC’s approach to
demonstrating consent compliance in site operations and management including the
reported that a sludge survey of the oxidation pond (in January 2006) indicated
that at the current rate of accumulation, sludge removal would not be required for
another 11 years.
An updated Management Plan (July 2007) was supplied by the consent holder for the
Wastewater Treatment Plant (see Appendix II; TRC 2007). This was updated further in
May 2008 together with the Management Plan for the Hector Place pumping station.
These continue to be reviewed and updated annually.
The Hector
application and estimated loading rates 34
2.1.6 Groundwater monitoring 36
2.1.6.1 Groundwater discussion 49
2.1.7 Soil monitoring 49
2.1.8 Biomonitoring of the Haehanga Stream 72
2.2 Air 78
2.3 Incidents, investigations, and interventions 80
page
ii
3 Discussion 85
3.1 Discussion of site performance 85
3.2 Environmental effects of exercise of consents 89
3.3 Evaluation of performance 98
3.4 Recommendations from the 2019-2020 Annual Report 122
3.5
that if E. coli
concentration on a given day exceeds 260 per 100 ml, daily sampling is required until the concentration falls
below 260. Because storm events in particular can lead to a transient high count due to faecal runoff and/or
wastewater overload, it is logical to have a rating system that considers the possibility of such extreme
measures and focuses on the anticipated range of measurements when swimming is likely.
In order to ensure an overall low level of risk for swimming in a
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with the Company’s
approach to demonstrating consent compliance in site operations and
www.trc.govt.nz
www.taranakibus.info
www.tupare.nz
www.hollardgardens.nz
www.pukeiti.nz
www.taranakiplants.net.nz
@TaranakiRC
@TaranakiCD
@TaranakiRG
TaranakiRegionalCouncil
TaranakiCivilDefence
TaranakiRegionalGardens
0800 736 222
0800 900 049
0800 827 287
Total Mobility: 0800 868 662
The Taranaki Regional Council has
adopted a Draft Annual Plan that
foreshadows a 1% rise in general
rates for the 2017-2018 financial
year.
page
138 2015/2025 Long-Term Plan
Appendix 1: Resource Management Act Charging Policy
SCHEDULE OF CHARGES PURSUANT TO
SECTION 36 OF THE RESOURCE
MANAGEMENT ACT 1991
SCHEDULE 1: SCALE OF CHARGES FOR
STAFF TIME
Rate for
processing
resource
consents and
responding to
pollution
incidents.
Rate for
all other
Council
work.
Level 1 Senior management $338/hr $317/hr
Level 2 Managers/supervisors $157/hr $147/hr