Your search for 'rates' returned 2336 results.

Flexgas Ltd Ahuro B Gas Storage Facility Annual Report 2021-2022

the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are found in Appendix II. For reference, in the 2021-2022 year, consent holders were found to achieve a high level of environmental performance and compliance for 88% of the

Coastal water quality 2018-2019

potential problem, the Benjamini-Hochberg False Discovery Rate (FDR) method was applied to the results of the Mann-Kendall test. Further justification for this statistical approach can be found in Stark and Fowles (2006). page 10 4 Results During the 2018-2019 bathing season, sampling was generally confined to weekdays, with no statutory holidays included. For these reasons, recreational usage of the waters at the time was generally less intensive,

Maui PS consent monitoring 2020-2021

compliance by OMV, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with OMV’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such as contingency

Annual report 2016-2017

discussing the various details of the performance and extent of compliance by NPDC, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with NPDC’s approach to demonstrating consent compliance in site operations and management including the

Annual report 2013-2014

reported that a sludge survey of the oxidation pond (in January 2006) indicated that at the current rate of accumulation, sludge removal would not be required for another 11 years. An updated Management Plan (July 2007) was supplied by the consent holder for the Wastewater Treatment Plant (see Appendix II; TRC 2007). This was updated further in May 2008 together with the Management Plan for the Hector Place pumping station. These continue to be reviewed and updated annually. The Hector

Remediation New Zealand Ltd Uruti Composting Facility Monitoring Programme Annual Report 2020 2021

application and estimated loading rates 34 2.1.6 Groundwater monitoring 36 2.1.6.1 Groundwater discussion 49 2.1.7 Soil monitoring 49 2.1.8 Biomonitoring of the Haehanga Stream 72 2.2 Air 78 2.3 Incidents, investigations, and interventions 80 page ii 3 Discussion 85 3.1 Discussion of site performance 85 3.2 Environmental effects of exercise of consents 89 3.3 Evaluation of performance 98 3.4 Recommendations from the 2019-2020 Annual Report 122 3.5

What is meant by swimmability - Sir Peter Gluckman, PM's Chief Science Advisor

that if E. coli concentration on a given day exceeds 260 per 100 ml, daily sampling is required until the concentration falls below 260. Because storm events in particular can lead to a transient high count due to faecal runoff and/or wastewater overload, it is logical to have a rating system that considers the possibility of such extreme measures and focuses on the anticipated range of measurements when swimming is likely. In order to ensure an overall low level of risk for swimming in a

Remediation NZ Ltd Waitara Road Facility Annual Report 2020 2021

Besides discussing the various details of the performance and extent of compliance by the Company, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and

Recount 104 - March 2017

www.trc.govt.nz www.taranakibus.info www.tupare.nz www.hollardgardens.nz www.pukeiti.nz www.taranakiplants.net.nz @TaranakiRC @TaranakiCD @TaranakiRG TaranakiRegionalCouncil TaranakiCivilDefence TaranakiRegionalGardens 0800 736 222 0800 900 049 0800 827 287 Total Mobility: 0800 868 662 The Taranaki Regional Council has adopted a Draft Annual Plan that foreshadows a 1% rise in general rates for the 2017-2018 financial year.

Appendices 1 and 2: RMA and Building Act charging policies

page 138 2015/2025 Long-Term Plan Appendix 1: Resource Management Act Charging Policy SCHEDULE OF CHARGES PURSUANT TO SECTION 36 OF THE RESOURCE MANAGEMENT ACT 1991 SCHEDULE 1: SCALE OF CHARGES FOR STAFF TIME Rate for processing resource consents and responding to pollution incidents. Rate for all other Council work. Level 1 Senior management $338/hr $317/hr Level 2 Managers/supervisors $157/hr $147/hr