Quarterly Operational Report September 2021
Quarterly Operational Report September 2021
Quarterly Operational Report September 2021
administrative performance Besides discussing the various details of the performance and extent of compliance by NPDC, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with NPDC’s approach to demonstrating consent compliance in site
measured. CBODF= filtered carbonaceous biological oxygen demand HC = hydrocarbons 2.1.4.3 20 November 2013 The sampling done on 20 November 2013 was done under low flow conditions with 3.5 mm of rain falling on the area over the previous 72 hours. The wetland was discharging at a trickle rate at the time of sampling. On this occasion the discharge was found to have moderate levels of CBODF and unionised ammonia. At the compliance point (HHG000103), the levels of unionised ammonia and
development of the region’s resources. 1.1.4 Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holder/s during the period under review, this report also assigns a rating as to each Company’s environmental and administrative performance. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative
Decision of Hearing Panel Remediation NZ Ltd 26 May 2021
Decision of Hearing Panel Remediation NZ Ltd 26 May 2021
Candidate information handbook - Taranaki Regional Council.
Plymouth Application Purpose: Change To take up to 60,480 cubic metres per day at a maximum rate of 740 litres/second of water from Lake Mangamahoe in the Waiwhakaiho catchment for municipal water supply purposes Change of consent conditions to upgrade the existing intake structures to avoid the entrainment of fish R2/10700-1.0 Commencement Date: 23 Nov 2018 Aviagen New Zealand Limited Expiry Date: 01 Jun 2036 PO Box 3395, Fitzroy, New Plymouth 4341 Review Dates: June 2024, June
the fact that the compliance point given in the consent is on the site boundary, at which point the Stream is piped, the downstream monitoring point is also downstream of other site discharges and further investigation is required. page Air quality monitoring showed that off-site there were no significant adverse effects in relation to suspended particulates, dust deposition rates or odour beyond the site boundary. An enclosed gas flare system was installed for air
Quarterly Operational Report December 2021