Your search for 'rates' returned 2332 results.

Remediation hearing - Council Officers' Final Recommendation

are shown on Figure 1, attached as Appendix 1 of these consents. Insert additional condition: minimum dissolved oxygen in the irrigation pond. Suggest 1 mg/L Irrigation 14. From a date no later than 60 days after these consents commencing, the consent holder shall measure and record the rate and volume of discharge from the Irrigation Pond at intervals not exceeding 1 minute to an accuracy of +5%. 15. The consent holder shall provide the Chief Executive, Taranaki Regional

Executive, Audit & Risk minutes June 2020

needs. 2.5 A discussion was held around rates relief/remission and although New Plymouth District Council have indicated that they are offering no penalties on rates it has been made clear to the public that this is only for the New Plymouth District Council portion of their rates. Communication lines between the all the Taranaki councils are open and none of the councils have indicated any issues. Recommends That the Taranaki Regional Council: a) receives the memorandum and …

Dairy effluent pond guidelines

Leakage and permeability. Taranaki soils. Dairy effluent pond types and features. Construction. This guide has been specifically developed for Taranaki and addresses storage ponds only. This reflects changes in effluent management from traditional treatment ponds (with discharge to water) to effluent holding ponds (with irrigation to land). For information on treatment ponds and leak rates from existing ponds see Managing Dairy Farm Effluent (Dairying and Environment Committee

Annual report 2015-2016

and extent of compliance by Origin Energy and AR Geary, this report also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the consent holder’s approach to demonstrating consent compliance in site operations and management including the timely

RLTPVariation NukumaruRail

............................................... 12 2.6 Recommended Modifications to the Design ................................................................................ 13 LIST OF TABLES Table 1-1: Documents Provided to SRT .................................................................................................... 3 Table 1-2: Concern Assessment Rating Matrix .......................................................................................... 4 Table 1-3: Concern Categories

Annual report 2014-2015

various details of the performance and extent of compliance by the consent holder/s during the period under review, this report also assigns a rating as to each Company’s environmental and administrative performance. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and

OMV NZ Ltd Pohukura Production Station Annual Report 2021-2022

achieving sustainable development of the region’s resources. 1.1.4 Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these

Annual report 2012-2013

Waitaha catchment consent monitoring report - Taranaki Regional Council.

Herd Properties Limited

further dust controls were required at the site. At approximately 1.18pm the first water truck arrived, however the rate of application was insufficient to reduce the dust discharge from the site. A second water truck arrived at 3.30pm. Dust discharge from the site began reducing upon the application of water to the exposed surfaces from both water trucks. 1,500 litres of Stabil-X was added to the water trucks. The application of 7 Affidavit of Daniel Charles Hunte

McKee Power Plant consent monitoring 2017-2018

also assigns them a rating for their environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such as contingency plans and water