Executive, Audit and Risk Committee Agenda July 2024
Executive Audit and Risk agenda 29 July 2024
Executive Audit and Risk agenda 29 July 2024
Opunake Power Ltd consent monitoring report 2017-2018
Opunake Power consent monitoring Annual report 2016-2017
Opunake hydro scheme consent compliance monitoring report 2015-16 - Taranaki Regional Council
Future directions for the management of river and stream bed modifications - Taranaki Regional Council.
Key Native Ecosystems Alfred Road - Kuwhatahi (p8-79)
7.4 45.1 72 8,000 2200 0950 9.8 - 8 - 7.1 39.7 12 1,600 250 9.8-20.3 - 8-33 3.9-4.4 7.1-7.5 39.7-47.0 12-72 800-26,000 250-2,200 - - - 39-73 22-49 - - 0-56 83-99 78-95 These results indicated typical ranges in effluent parameters for a single oxidation treatment pond receiving essentially domestic wastes. A decrease in faecal coliform bacterial numbers
Opunake Hydro Ltd consent monitoring report - Taranaki Regional Council.
240, and 190 cfu/100 ml, respectively). The conductivity results associated with the three samples were indicative of varying degrees of freshwater influence from the adjacent Onaero River mouth (Appendix I). Considerable rainfall occurred prior to the first exceedance on 19 December (46 mm in 72 hours; Appendix I). The remaining 16 samples collected over the summer were within ‘Surveillance’ mode. Table 6 Performance against guidelines at Onaero Beach (at the Surf Club) Parameter …
Trustpower Motukawa Hydroelectric Power Scheme consent monitoring report 2018-2019