Your search for '72' returned 957 results.

Annual report 2014-2015

period ending 30 June 2015, there is a total of 136 km of the 139 km of Mangawhero Stream banks (upstream of the Mangawharawhara Stream confluence) adequately fenced and 21 km with riparian vegetation. A further 3 km (fencing) and 10 km (vegetation) have been recommended within riparian farm plans for completion. Correspondingly, 54 km (fencing) and 31 km (vegetated) of the 72 km of Mangawharawhara Stream banks (to the Waingongoro River confluence) are adequately riparian protected with an

Annual report 2012-2013

TAG Oil Vanner landfarm consent monitoring report - Taranaki Regional Council.

Annual report 2015-2016

Port area industrial catchments consent monitoring report - Taranaki Regional Council.

Annual report 2014-2015

consent 70 page ii 4. Recommendations 71 Glossary of common terms and abbreviations 72 Bibliography and references 75 Appendix I Resource consents held by Trustpower for the Motukawa HEP Scheme 1 Appendix II Biomonitoring reports 1 page iii List of tables Table 1 Gauging results for gaugings undertaken in relation to the Manganui River residual flow 24 Table 2 Gauging results for gaugings undertaken in relation to the

Freshwater physicochemical monitoring 2016-2017

for recreation at 13 SEM sites and two NIWA sites in Taranaki 72 Figure 12 Scatterplots of selected parameters for selected sites where significant trends have been reported (flow adjusted data and LOWESS trend line (span 30%)) 79 Figure 13 Specific changes in trend for nutrients, bacteria, organics and aesthetic parameters in the long term (22 years) and current (7 years) trend 85 page 1 1 Introduction The Resource Management Act 1991 (‘the RMA’)

Mangati Catchment Joint Monitoring Programme Annual Report 2020 2021

Tegel’s consent 4038-6 67 Table 36 Tegel de Havilland Drive stormwater discharge sampling, 12 October 2020 70 Table 37 Tegel de Havilland Drive stormwater sampling results, 17 August 2021 71 Table 38 Tegel stormwater and wetland sampling results, 28 October 2020 71 Table 39 Tegel stormwater and wetland sampling results, 22 February 2021 72 Table 40 Tegel stormwater and wetland sampling results, 17 August 2021 72 Table 41 Summary of performance for Tegel consent 3470-4 73