Your search for '72&76 CUTFIELD ROAD WESTOWN' returned 2472 results.

Annual report 2015-2016

page Inglewood Metal Limited Quarry Monitoring Programme Annual Report 2015-2016 Technical Report 2016-119 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1723586 (Word) STRATFORD Document: 1726953 (Pdf) November 2016 page page Executive summary Inglewood Metal Limited (the Company) operates a quarry located at Everett Road in the

Mangati catchment consent monitoring 2017-2018

18 Investigations, interventions, and incidents 112 19 Chemical monitoring of combined discharges 113 19.1 Drain between De Havilland Drive West and Connett Road West 113 19.2 Industrial stormwater and the wetland discharges 113 19.2.1 Connett Road pond one inlet (STW001055) 114 19.2.2 Industrial drain outlet (STW001026) and discharge (MGT000503) 115 19.2.3 Pond 3 and 4 discharges 116 20 Receiving environment monitoring in the Mangati Stream 119 20.1 Mangati Stream

Monitoring report 2008-2015

species per quadrat) and diverse (median Shannon Wiener index = 0.85 per quadrat) due to the high energy wave environment, lack of stable habitat and periodic sand inundation. Sand deposition has been shown to have a profound effect on intertidal communities in Taranaki. The reef sites at Mangati and Greenwood Road (north Taranaki) were particularly prone to periodic sand inundation. Years of high sand accumulation at these sites resulted in lowered species richness and diversity. Trend

Application Appendix F Hydrology Assessment 20 02053 4 0 + 5 other renewals Trustpower 25 Nov 2020

Stream that was built in 1931 that replaced an older scheme established around the turn of the century (1995 AEE). Most of the inflow (85%) to Lake Mangamahoe is sourced from a diversion on the Waiwhakaiho River that comprises an intake and tunnel on the left bank of the river. The balance of the lake inflow (15%) is derived from natural tributaries to the lake, principally the Mangamahoe Stream and Kent Road Stream. Water is returned to the Waiwhakaiho River via the MGR power station at Hydro

Annual report 2013-2014

Introduction 8 1.5.1 Programme liaison and management 8 1.5.2 Site inspections 8 1.5.3 Chemical sampling 9 1.5.4 2. AA Contracting Limited – Henwood Road 10 2.1 Site description and activities 10 2.2 Results 10 Inspections 10 2.2.1 Results of receiving environment monitoring 11 2.2.2 2.3 Investigations, interventions, and incidents 11 2.4 Discussion 12 Discussion of site performance 12 2.4.1 Environmental effects of exercise of consents 12 2.4.2 Evaluation of performance 12 2.4.3

McKechnie Aluminium monitoring 2019-2020

aluminium foundry and extrusion process situated at Paraite Road, in the Mangaone and Mangati catchments, Bell Block. The location of the site is shown in Figures 1 and 2. Copper and brass foundries and extrusion processes had previously been operated at the site. Copper processing ceased in June 2002 and brass processing ceased in January 2003. MASL also previously operated a separate powdercoating facility on Connett Road in the Mangati catchment. This operation was shifted to the main Paraite …

Biennial report 2013-2015

page C D Boyd - Surrey Road Quarry Monitoring Programme Biennial Report 2013-2015 Technical Report 2015-40 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1538096 (Word) STRATFORD Document: 1566714 (Pdf) October 2015 page page Executive summary C D Boyd (the consent holder) operates a quarry located off Surrey Road at Inglewood, in

The Waitara (from Clearing the Water, by Jim Tucker)

brown. Naturally, it’s more intricate than that. Down near the mouth, if the tide is coming in and the light’s just right on a fine autumn morning and there hasn’t been any rain for a day or two, the water is the deep, dark green of pounamu as it slides past the town. Upstream at the graceful Bertrand Road swing-bridge, it has the hues of a weak flat white coffee, and in Tarata country at Pūrangi Bridge, it’s army camouflage. In the high hill country, north of the “republic” of

web SH3SafetyImprovementsUpdate Sept2019

page SH3 New Plymouth to Hawera Taranaki Regional Transport Committee – project update 11 September 2019 page What we heard › Safety at intersections. › Urban speed zones and their locations were a concern. › A desire for more urban cross opportunities. › Community amenity access and active mode safety is a concern in all towns. › Road surface condition. › Safe access on and off SH3 in the 100km/h sections was a consistent theme. › Narrow bridges

Lower Waiwhakaiho air discharges monitoring 2019-2020

2 Downer EDI Works Ltd 2.1 Introduction 2.1.1 Process description The purpose of the Downer EDI Works Ltd (Downer) plant is to produce asphalt for use on roads and driveways etc. A permanent drum mix plant has replaced the batch plant and mobile plant that were formerly in use at the site. The asphalt production is achieved by the following processes. The plant is a parallel-flow drum mix plant consisting of a rotary drum (which is used to both dry and heat the aggregate and to mix …