Your search for '72&76 CUTFIELD ROAD WESTOWN' returned 2483 results.

Summer 2009-2010

Compliance with guidelines 44 3.2.8.2 Comparison with previous summers’ surveys 45 3.2.8.3 Cyanobacteria 45 3.2.9 Timaru Stream at Weld Road (near mouth) 46 page ii 3.2.9.1 Compliance with guidelines 48 3.2.9.2 Comparison with previous summers’ surveys 48 3.2.10Waimoku Stream at Oakura beach 50 3.2.10.1 Compliance with guidelines 52 3.2.10.2 Comparison with previous summers’ surveys 53 3.2.11Oakura River below SH45 54 3.2.11.1 Compliance with guidelines 56 3.2.11.2 Comparison

Annual report 2014-2015

2014-2015 period 21 Figure 7 Water temperature monitoring sites (W1, W5, W7) in the lower Waiwhakaiho River catchment 24 Figure 8 Aerial location map of monitoring sites 25 Figure 9 Water temperature (˚C) in the Waiwhakaiho River (Egmont Village – SH3 (upper), Hydro Road (centre), and Rimu Street (lower)), for the period 1 July 1992 to 30 June 2015 27 Figure 10 Instantaneous water temperature differences (˚C) between Waiwhakaiho River sites during the monitoring period – SH3 and

Summer 2012-2013

3.2.10.1 Comparison with guidelines 51 page ii 3.2.10.2 Comparison with previous summers’ surveys 51 3.2.10.3 Cyanobacteria 52 Timaru Stream at Weld Road (near mouth) 52 3.2.11 3.2.11.1 Comparison with guidelines 55 3.2.11.2 Comparison with previous summers’ surveys 55 Oakura River below SH45 56 3.2.12 3.2.12.1 Comparison with guidelines 58 3.2.12.2 Comparison with previous summers’ surveys 59 Waitara River at the town wharf, Waitara 60 3.2.13 3.2.13.1

Waitaha catchment consent monitoring 2017-2018

concrete products manufacturing premises into the Waitaha Stream 9 01 Jun 2032 June 2020 Energyworks Ltd 9606-1.1 To discharge emissions into the air associated with abrasive blasting operations, spray painting and associated activities at a permanent site at Connett Road East, Bell Block and from mobile operations throughout the Taranaki region 19 01 Jun 2020 - Energyworks Ltd 9962-1 To discharge stormwater via the New Plymouth District Council reticulated stormwater system into

Annual report 2015-2016

production station and adjacent wellsite, located on Lower Otaraoa Road at Motunui in the Waipapa and Manu catchments. This report for the period July 2015 to June 2016 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the Company’s environmental performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of the Company’s activities. The Company holds a

Port Area Industrial Catchments Hongihongi & Herekawe Annual Report 2021-2022

approximately 1.5 ha of land adjacent to the New Zealand Oil Services Limited storage facility (Figure 2). Figure 2 Aerial photography of Beach Energy and NZOSL sites The southern part of the site includes two hydrocarbon storage tanks. The northern part of the site, along the road frontage, includes a tanker unloading building, staff facilities and the stormwater treatment system. The stormwater treatment oil separator has a capacity of 9.6 m3. Stormwater directed to the treatment system

Stratford WWTP monitoring report 2017-2018

(SDC) operates a municipal wastewater treatment plant (WWTP) located on Victoria Road at Stratford, in the Patea catchment. This report for the period July 2017 to June 2018 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess SDC’s environmental and consent compliance performance during the period under review. The report also details the results of the monitoring undertaken and assesses the environmental effects of SDC’s activities. SDC

McKee Power Plant Consent Monitoring 2021-2022

page Executive summary Todd Generation Taranaki Ltd (the Company) operates the McKee Power Plant on Otaraoa Road near Tikorangi, bridging the Waitara and Onaero catchments. Located to the south of the McKee Production Station (which processes oil and gas from the McKee and Mangahewa groups of wellsites), the McKee Power Plant was completed and commissioned during the 2012-2014 period. The 100 MW electricity generating facility provides both peak and base load power for the

Summer 2011-2012

Kaupokonui River at Beach Domain 44 3.2.9.1 Compliance with guidelines 48 page ii 3.2.9.2 Comparison with previous summers’ surveys 48 3.2.10 Lake Opunake 49 3.2.10.1 Compliance with guidelines 51 3.2.10.2 Comparison with previous summers’ surveys 51 3.2.10.3 Cyanobacteria 52 3.2.11 Timaru Stream at Weld Road (near mouth) 53 3.2.11.1 Compliance with guidelines 55 3.2.11.2 Comparison with previous summers’ surveys 55 3.2.12 Oakura River below SH45 56 3.2.12.1

Lower Waiwhakaiho air discharges consent monitoring 2017-2018

2018 24 Figure 6 Location of Katere Surface Coatings Ltd and their deposition gauge sites 28 Figure 7 Deposition gauge results for the Katere Surface Coatings monitoring sites from July 2013 to July 2018 32 Figure 8 Ravensdown Fertiliser Co-operative Ltd site and deposition gauge locations 37 Figure 9 Deposition gauge results for the three Ravensdown monitoring sites from July 2013 to July 2018 40 Figure 10 Location of Intergroup Ltd blasting facilities at Colson Road 44