Your search for '67 poplar grove' returned 985 results.

Quarterly Operational Report December 2017

Provide annually, on a cost-recovery basis, approximately 450,000 suitable plants for land stabilisation, soil conservation and riparian planting programmes. To the end of December 2017, 242,036 plants have been ordered for the year. Implement the South Taranaki and Regional Erosion Support Soil Conservation Programme including an estimated 4,000 poplar poles, 50 ha of protection forestry and construction of 22 km of retirement fencing to retire 400 ha

Quarterly Operational Report March 2017

Trust "Wild For Taranaki". Provide annually, on a cost-recovery basis, approximately 450,000 suitable plants for land stabilisation, soil conservation and riparian planting programmes. To date, 306,149 plants have been ordered. Implement the South Taranaki and Regional Erosion Support Soil Conservation Programme including an estimated 6,000 poplar poles, 50 ha of protection forestry and construction of 22 km of retirement fencing to retire

Remediation NZ Uruti Annual Report 2023-2024

Summary of performance for Consent 5839-2 64 Table 36 Summary of performance for Consent 5938-2 65 Table 37 Summary of performance for Consent 6212-1 66 Table 38 Summary of performance for Consent 10063-1.0 66 Table 39 Summary of performance for Consent 10547-1.0 67 Table 40 Summary of performance for Consent 10843-1 68 Table 41 Summary of performance for Consent 10825-1.0 69 Table 42 Summary of performance for all consents 71 Table 43 Evaluation of environmental performance over time 71

Mangapouri Cemetery consent monitoring 2019-2020

CaCO3 60 72 80 76 72 126 126 112 124 60 126 Carbonate g/m3 CO3 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 Bicarbonate g/m3 HCO3 73 88 98 92 88 154 153 137 151 73 154 Total hardness g/m3 CaCO3 55 61 74 67 74 88 88 90 95 55 95 Electrical conductivity mS/m 18.7 20.4 21.1 21.7 19.8 30.6 33.7 28.6 30.7 18.7 33.7 Total suspended solids g/m3 3 4 40 <3 <3 8 4 <3 11 <3 40 Total dissolved solids g/m3 111 120 129 133 127 168 193 197 179 111 197 Dissolved aluminium g/m3 <0.003 <0.003 <0.003 …

Waste Remediation Services Symes Manawapou LF Annual Report 2023 2024

<0.7 <0.7 <0.7 <0.7 <0.7 <0.7 Calcium (Sat Paste) mg/L 312 387 233 400 479 291 365 Magnesium (Sat Paste) mg/L 45 55 32 64 90 51 67 Sodium (Sat Paste) mg/L 152 172 142 272 477 326 326 page 21 The analysis of the soil samples indicated the following: • Sodium absorption ratio (SAR) ranged from 2.1 to 5.2mmol/L0.5, the limit is set at <18mmol/L0.5. These concentration levels are well below the consent surrender limit. • In terms of petroleum

Periphyton monitoring 2018-2020

Indeterminate 4/4 4/4 3 3 Skinner Road 19.2 Moderate Indeterminate Indeterminate 4/4 2/4+ 142 621n Punehu Wiremu Road 4.4 Very good Increasing* Indeterminate 4/4 4/4 3 2 SH45 20.9 Good Indeterminate Indeterminate 4/4 4/4 13 16 Waingongoro Opunake Road 7.2 Very good Decreasing* Indeterminate 4/4 4/4 44 64 Stuart Road 29.6 Very good Indeterminate Indeterminate 4/4 4/4 75 92 Ohawe Beach 66.6 Good Increasing* Indeterminate 4/4 4/4 55 67 Waiongana SH3a 16.1 Good Indeterminate …

Annual report 2016-2017

Lower Waiwhakaiho Air Discharges consent monitoring report 2016-2017,