Waverley Beach Water Supply (27 March 2018)
The existing bore (permitted use) and plant were inspected and found to be compliant with Regional
Freshwater Plan (RFWP) rules. The oprations log was inspecteed and no issues were noted.
Waverley Water Supply (27 March 2018)
The Swinbourne Street bore was in service although not abstracting at the time of inspection as the
reservoir was near full. The Fookes Street and Chester Street bores were not in service. No issues were noted
in regard
Todd Kapuni gas treatment plant resource consent monitoring report 2019-2020
Greymouth Petroleum Ltd Turangi B Hydraulic Fracturing Report 2019-2021
understanding of, or bought about change on, environmental issues.
list_Paragraph_spacing Demonstrated innovation or collaboration.
NOMINEE DETAILS
tbltxt Name of person (if applicable):
Click or tap here to enter name of nominee.
tbltxt Name of organisation (if applicable):
Click or tap here to enter organisation.
tbltxt Postal address: Street name / PO Box:
tbltxt Town:
tbltxt Postcode:
tbltxt Click or tap here to enter Street name/PO Box.
Click or tap
performance for Consent 1185-3 52
Table 22 Summary of performance for Consent 1186-3 53
Table 23 Summary of performance for Consent 3927-2 54
Table 24 Summary of performance for Consent 3928-2 54
Table 25 Summary of performance for Consent 4102-2 54
Table 26 Summary of performance for Consent 5365-1 55
Table 27 Summary of performance for Consent 0232-4 56
Table 28 Summary of performance for Consent 5574-2 57
Table 29 Summary of performance for Consent 9473-1 57
Table 30 Summary of performance for
page
HAWERA – NEW PLYMOUTH RETURN
via intermediate towns
Saturday Timetable – December 2020
DEPART FROM STOPS TIMETABLE
Opunake Napier St (opposite TSB) 9.00 am
Manaia South Rd (Public Pool) 9.20
Hawera i-SITE 9.35
Normanby Total Aluminium 9.45
Eltham Bath Street 9.55
Stratford Health Centre 10.04
Miranda St 10.09
Midhirst Jamieson Recovery 10.14
Inglewood Moa St 10.30
Egmont Village Old dairy 10.35
New Plymouth Liardet Street 10.45
Egmont St 10.50
DEPART FROM STOPS
ISSN: 1178-1467 (Online)
Document: 3272057 (Word)
Document: 3296106 (Pdf)
October 2024
page
page
Executive summary
The South Taranaki District Council (STDC) operates a municipal wastewater treatment plant (WWTP)
located on Castle Street at Eltham, in the Waingongoro catchment. This report for the period July 2023 to
June 2024 describes the monitoring programme implemented by the Taranaki Regional Council (the
Council) to assess STDC’s
page
TARANAKI MĀORI CONSTITUENCY
NOMINATION PAPER
To: Electoral Officer, Taranaki Regional Council
PO Box 5135, Victoria Street West, Auckland 1142
A. For the TWO NOMINATORS to complete (Nominators must be electors on the electoral roll for the Taranaki Māori Constituency)
We, the undersigned electors of Taranaki Māori Constituency nominate (enter candidate details):
with their consent, as a candidate for Member of the Taranaki Māori Constituency for the election to be
page
SOUTH TARANAKI GENERAL CONSTITUENCY
NOMINATION PAPER
To: Electoral Officer, Taranaki Regional Council
PO Box 5135, Victoria Street West, Auckland 1142
A. For the TWO NOMINATORS to complete (Nominators must be electors on the electoral roll for the South Taranaki General Constituency)
We, the undersigned electors of South Taranaki General Constituency nominate (enter candidate details):
with their consent, as a candidate for Member of the South Taranaki General