Longview Farm.
In comparison, for the 2015-2016 review period, a total of 23,773 kg of nitrogen was applied to the entire
area, at an average concentration of 101 g/m³. The average nitrogen loading was 215 kg/ha/y, being 250
kg/ha/y on Longview Farm and 53 kg/ha/y adjacent to the plant. The highest loading for a single sector was
382 kg/ha/y, on Longview Farm.
2.1.3.2 Groundwater monitoring
The locations of the six groundwater monitoring points (MPs) are depicted in Figure 1 and Figure 2
Hollard Gardens Asset Management Plan 2017.
Agenda for Ordinary Council meeting April 2017.
Scheduling and planning 39
2 Bringing the resources together 42
3 Safety planning and preparation 45
4 Training 47
5 Implementation of the survey 49
6 Data collection and checking 51
SECTION 6 Presenting and Reviewing Data 52
1 Assimilating all the data 53
2 Deciding on display options 54
3 Presentation and review 56
SECTION 7 Appendices 58
1 Task Sequence Sheet 59
2 Aspects of Hui Tikanga and Good Administration 60
3 Aspects of Tikanga Moana and Respectful Practices Relevant to a Survey 61
4
TAG Oil Vanner landfarm consent monitoring report - Taranaki Regional Council.
Origin Energy Kupe production station consent monitoring report - Taranaki Regional Council.
performance for Consent 4103-2.3 52
Table 28 Summary of performance for Consent 5044-2.0 53
Table 29 Summary of performance for Consent 6257-1.1 54
Table 30 Summary of performance for Consent 6273-1.1 56
page
iv
Table 31 Summary of performance for Consent 7465-1.0 57
Table 32 Summary of performance for Consent 4406-2.0 58
Table 33 Summary of performance for Consent 5036-2.0 58
Table 34 Summary of performance for Consent 9908-1.0 60
Table 35 Summary of
monitoring 48
10.3 Evaluation of performance 50
11 Symons Property Development Ltd 52
11.1 Site description 52
11.2 Results 52
11.2.1 Inspections 52
11.2.2 Results of discharge monitoring 53
11.3 Investigations, interventions, and incidents 54
11.4 Evaluation of performance 55
12 Taranaki Sawmills Ltd 57
12.1 Site description 57
12.2 Inspections 60
12.2.1 Air inspections 61
12.3 Water 61
12.3.1 Results of discharge monitoring 61
12.4 Air 63
12.4.1 Results
Policy & Planning Committee agenda March 2019
Evaluation of performance 40
2.5 Recommendations from the 2014-2015 Annual Report 45
2.6 Alterations to monitoring programmes for 2016-2017 46
2.7 Recommendations 46
page
ii
3. Waitara Valley 47
3.1 Process description 47
3.1.1 Water discharges 49
3.1.2 Emissions to air 49
3.1.3 Solid wastes 49
3.2 Resource consents 49
3.2.1 Water abstraction permits 50
3.2.2 Land use permit 51
3.2.3 Water discharge permits 51
3.2.4 Air discharge permit 53
3.3 Results 54