Your search for '53 cumming street' returned 1595 results.

Colson Rd Landfill consent monitoring 2019-2020

sites on the Puremu Stream downstream of the landfill 39 Figure 10 Biomonitoring sites related to the Colson Road landfill, New Plymouth 47 page iv Figure 11 Chloride concentrations in the Colson Road groundwater bores, June 2006 to date 51 Figure 12 Nitrate/nitrite nitrogen concentrations in the Colson Road groundwater bores, June 2006 to date 52 Figure 13 Methane and temperature recorded by the landfill gas flare for the year under review 53 Figure 14 …

Annual report 2015-2016

the biomonitoring sites in the Inaha Stream and an unnamed tributary stream relating to discharges from the Taranaki By- Products plant. 47 Figure 9 Wastewater and fertiliser application areas with groundwater monitoring well locations 53 Figure 10 Nitrate/ Nitrite concentration at GND1058 Shearer 2011-2016 long term record 54 Figure 11 Groundwater level, Nitrate/Nitrite concentrations and conductivity in BH1 GND1054 2012-2016 54 Figure 12 Nitrite/Nitrate concentration and

Summary of submissions

used by a much larger portion of the Taranaki population. In particular the New Plymouth area is very short of indoor stadium space for sports such as basketball, netball, volleyball, Futsal. All of these sports are growing in Taranaki while the number of junior Rugby players is rapidly decreasing yet we prioritise this sport over growing sports? 52 Robert Lord 1 1 - 53 Paul Lobb 1 1 No option above for what I would prefer. I would like another option of

Port Taranaki industries monitoring 2018-2019

View Parade or Whitely Street (which also discharge through the outlet 49). These observations were supported by the results of samples collected at the time. Port staff were instructed to take immediate action to clean the sump and stormwater outlet. page 19 • Follow up investigations were undertaken on Saturday 30 March which identified extensive contamination of the reclamation stormwater network along the road side of the storage facility. Regal Haulage, the company

Annual report 2015-2016

the Hawera WWTP pipeline and no overflows occurred into the Mangawhero Stream tributary. Planting of the eastern and northern perimeters of the WWTP (with native vegetation) and the Castle Street boundary was undertaken by the consent holder during the 2009- 2010 period. The levelled sludge disposal area continues to be grassed for grazing purposes (STDC, pers.comm.) Results of WWTP monitoring 2.2 Primary oxidation pond effluent quality 2.2.1 No assessments of the primary pond