Your search for '53 cumming street' returned 1580 results.

Climate change projections and impacts for Taranaki May 2022

3-27: Projected annual hot day (days with maximum temperature ≥25°C) changes by 2040 and 2090, under RCP4.5 and RCP8.5. 48 Figure 3-28: Median annual Growing Degree-Days (GDD) base 10°C. 50 Figure 3-29: Projected increase in number of growing degree days per year (base 10°C) at 2040 (2031-2050) and 2090 (2081-2100) for RCP4.5 (left panels) and RCP8.5 (right panels). 51 Figure 3-30: Modelled annual rainfall (mm), average over 1986-2005. 53 Figure 3-31: Modelled seasonal rainfall

Annual report 2014-2015

adjoining properties and dried out before burning and burying. This was implemented by the landowners. The stream margin from above the Eltham WWTP, downstream to the confluence of the Mangawharawhara Stream has continued to be monitored over the 2007 to 2014 period for willow regrowth, assessment of previous plantings and the impact of willow removal. Particular attention continues to be paid to the area adjacent to the old Eltham landfill, downstream of the Castle Street bridge. For the

Mangapouri Cemetery consent monitoring 2019-2020

results GND2623-west Parameter Bore id MW1 (GND2623) Sample date Unit 27-Feb-17 26-May-17 28-Aug-17 16-Nov-17 22-Jul-19 14-Oct-19 17-Jan-20 30-Apr-20 20-Jul-20 Minimum Maximum pH pH 6.2 6.3 6.2 6.2 6.1 6.0 6.2 6.2 5.9 5.9 6.3 Total alkalinity g/m3 CaCO3 39 43 39 48 44 45 58 68 40 39 68 Carbonate g/m3 CO3 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 Bicarbonate g/m3 HCO3 47 52 47 59 53 55 71 82 49 47 82 Total hardness g/m3 CaCO3 33 32 35 39 41 39 46 56 38 32 56 Electrical …

Westside deep well injection monitoring 2020-2021

injection pressure D2H (bar) Avg. injection pressure D4HST2 (bar) 2020-2021 2.49 1.8 36 9 9 2019-2020 17,404 160 50 28 29 2018-2019 6,646 146 53 14 23 2017-2018 31,168 177 50 33 38 2016-2017 12,164 116 45 26 26 2015-2016 19,276 198 39 23 22 2014-2015 11,310 133 39 17 17 2013-2014 20,827 146 40 31 31 2012-2013 23,677 144 41 21 17 Note * Consent conditions were updated 18 December 2018 and limits were removed page 13

Policy & Planning agenda February 2020

........................................................................... 41 REFERENCES .............................................................................................................................................. 45 APPENDIX A: ESR 2018 PROCEDURES FOR SAMPLING PESTICIDES AND EOCS ............................. 48 APPENDIX B: ESR PESTICIDE SAMPLING FIELD SHEET ....................................................................... 53 APPENDIX C: LIST OF PESTICIDES AND LIMITS OF DETECTION …

Trustpower Motukawa Hydro consent monitoring 2018-2019

Summary of performance for Consent 6388-1 52 Table 25 Summary of performance for Consent 6390-1 53 Table 26 Summary of performance for Consent 6391-1 54 Table 27 Summary of performance for Consent 6381-1 55 Table 28 Summary of performance for Consent 6385-1 56 Table 29 Summary of performance for Consent 6386-1 57 Table 30 Summary of performance for Consent 6387-1 58 Table 31 Evaluation of overall environmental performance over time 58 List of figures Figure 1 Main