Injection Operation
Management Plan for each active injection well. The plans are required to include the operational details of
the injection activities and to identify the conditions that would trigger concerns about the integrity of the
injection well, the receiving formation or overlying geological seals. The plans are also required to detail the
action(s) to be taken by the consent holder if trigger conditions are reached. The Company was also
required to submit well construction details, an
Stream
Condition requirement Means of monitoring during period under
review
Compliance
achieved?
1. Adoption of best practicable option Site inspection Yes
2. Catchment area not to exceed 5 ha Site inspection and liaison with consent
holder Yes
3. Maintenance of a contingency plan Plan up to date as of July 2020 Yes
4. Maintenance and management of the
stormwater system in accordance with
application documentation
Site inspection and liaison with consent
holder Yes
page
page
page
Proposal for inclusion of mustelids
Regional Pest Management Plan for Taranaki
Taranaki Regional Council
Private Bag 713
Stratford 4352
November 2020
Document number: 2437760
page
page
i
Foreword
This is a proposal to amend the Regional Pest Management Plan for Taranaki. The
for the new East Stand. The Stadium is planned
to be open in 2022 with a repaired West Stand and the new East Stand under construction.
Financial Highlights
The Trust’s 2020/2021 funding was focussed on the delivery of the repair and refurbishment project. To date the project
spend is $7.1m.
The delivery of the repair and recovery programme will require the Trust to borrow up to $30m from the Taranaki
Regional Council (in addition to the existing $5m loan facility).
page
Taranaki Regional Council Marine Oil Spill Contingency Plan Page 1 of 6
Issue 3 October 2020 – Doc# 1098252 Annex 8
ANNEX 8
Health & Safety Procedures & Protocols
Health and Safety
Health and safety will be undertaken under the Council’s Health and Safety policy as follows:
page
Page 2 of 6 Taranaki Regional Council Marine Oil Spill Contingency Plan
Annex 8 Issue 3 October 2020 – Doc# 1098252
The Council’s Marine Oil Spill Response
page
Taranaki Regional Council Marine Oil Spill Contingency Plan Page 1 of 12
Issue 3 October 2020 – Doc# 1098131 Annex 2
ANNEX 2
Personnel Details and Mobilisation Instructions
These instructions set out the procedure to be followed when mobilising personnel in
response to a marine oil spill. The decision to mobilise will be made by the Incident
Command Team (ICT) and confirmed by the Regional On-Scene Commander (ROSC).
Following is information on the personnel
page
Taranaki Regional Council Marine Oil Spill Contingency Plan Page 1 of 26
Issue 3 October 2020 – Doc# 1098084 Annex 1
ANNEX 1
Equipment Lists and Resources
Emergency Operations Centre
The Emergency Operations Centre (EOC) location is dependent on the location and
magnitude of the spill.
The EOC could be established:
close by the spill site;
within Taranaki Regional Council’s office at 47 Cloten Road, Stratford; or
at the Taranaki Emergency
STDC Water Supplies Annual Report 2022-2023
page
Lower Waiwhakaiho Flood Control
Scheme
Asset Management Plan
Taranaki Regional Council
Private Bag 713
Stratford 4352
25 August 2020
Document: 1931168
page
Lower Waiwhakaiho Flood Control Scheme Asset Management Plan
Updated – 25 August 2020 1
Table of Contents
1. Introduction ................................................................................................................. 5
page
Lower Waiwhakaiho Flood Control
Scheme
Asset Management Plan
Taranaki Regional Council
Private Bag 713
Stratford 4352
25 August 2020
Document: 1931168
page
Lower Waiwhakaiho Flood Control Scheme Asset Management Plan
Updated – 25 August 2020 1
Table of Contents
1. Introduction ................................................................................................................. 5