tributary of the Manganui
River in the Waitara catchment
28/11/2008 2027
9903-1 To take and use groundwater from a bore for general
water supply purposes at the Mangahewa-D wellsite 26/05/2014 2033
Mangahewa-E
9453-1
To discharge treated stormwater and produced water
from hydrocarbon exploration and production
operations at the Mangahewa-E wellsite, onto land
and into an unnamed tributary of the Waiau Stream
01/02/2013 2027
9455-1
To discharge emissions to air
Interim Review of the Regional Policy Statement for Taranaki 2010.
Methanex consent monitoring report - Taranaki Regional Council.
Trustpower Pātea hydro power scheme resource consent monitoring report 2019-2020
Policy & Planning Committee agenda April 2021
Policy & Planning Committee agenda March 2020
Trustpower Patea Hydroelectric Power Scheme consent monitoring report 2018-2019
exploration and production operations at the
Mangahewa-D wellsite onto and into land in the
vicinity of an unnamed tributary of the Manganui
River in the Waitara catchment
28/11/2008 2027
9903-1 To take and use groundwater from a bore for general
water supply purposes at the Mangahewa-D wellsite 26/05/2014 2033
Mangahewa-E
9453-1
To discharge treated stormwater and produced water
from hydrocarbon exploration and production
operations at the Mangahewa-E wellsite, onto land
and
ammonia concentrations reached 5ppm and the “drum excavation” area where volatile
organic compound (VOC) concentrations were recorded at 1.2ppm. Neither of these
measurements is significant.
5.2 Depth of Cover Measurements
5.2.1 Upper and middle levels
Some depth to waste information was available from NPDC files from an investigation
carried out in October 1994 on the upper two levels of the park. Soil borings in 12
locations on the top level and six locations on the
Freshwater recreational bathing summer 2019-2020 monitoring report