Your search for 'forms' returned 2235 results.

Application 1796 (renewal) - Ōpunake Power Ltd

page Resource Consent Application (For a water permit pursuant To take and use surface water for (A separate application form is required for each consent being applied for) Important: Please read carefully All applicants need to respond to all of the questions. If a particular section is not applicable to your application, please say so; do not leave the question blank documentation if it is more convenient or insufficient space is specifically on

Application 10826 - Ōpunake Power Ltd

page 07/19 - #623858 Page 1 of 17 Resource Consent Application (Pursuant to section 88 of the Resource Management Act 1991) Discharge Permit To discharge contaminants to water or land (A separate application form is required for each consent being applied for) Important: Please read carefully before completing the form All applicants need to respond to all of the questions. If a particular section is not applicable to your

Statement of Proposal - Proposed Navigation Bylaws for Port Taranaki & its approaches

the current Bylaws, including formal consultation with those affected under a prescribed process outlined in the LGA. page Legislative compliance Under section 155 of the LGA in the making of the Navigation Safety Bylaws the Council has to consider whether:  the proposed Bylaws are the most appropriate way of addressing a perceived problem;  the proposed Bylaws are the most appropriate form of Bylaws, and  the proposed Bylaws are not inconsistent with the …

8AEE AppendixF

2 Organic Inputs flow chart Appendix 3 Organic Additives flow chart page Remediation (NZ) Ltd RW-P-751-001-B Organic Production Protocols Greenwaste Composting & Vermiculture Appendix 4 Sample Dispatch form Appendix 5 Sample transporters declaration -3 page Remediation (NZ) Ltd RW-P-751-001-B Organic Production Protocols Greenwaste Composting & Vermiculture 1. COMPOST PRODUCTION 1. 1. Objectives and Aims The goal of the Remediation CNZ) Ltd Organic

RKM Farms monitoring report 2020-2021

a leak. CBOD Carbonaceous biochemical oxygen demand. A measure of the presence of degradable organic matter, excluding the biological conversion of ammonia to nitrate. cfu Colony forming units. A measure of the concentration of bacteria usually expressed as per 100 millilitre sample. COD Chemical oxygen demand. A measure of the oxygen required to oxidise all matter in a sample by chemical reaction. Conductivity Conductivity, an indication of the level of dissolved salts in a

Renewal 5692 application - Ōpunake Power Ltd

page Resource Consent Application (Pursuant to section [to excavate, drill, tunnel, disturb or deposit material on the bed of a river, (A separate application form is requ Important: Please read carefully All applicants need to respond to all of the questions. If a particular section is not applicable to your application, please say so; do not leave the qu documentation if it is more convenient or insufficient space is specifically on the

Application 1795 (renewal) - Ōpunake Power Ltd

page Resource Consent Application (For a water permit pursuant To take and use surface water for (A separate application form is required for each consent being applied for) Important: Please read carefully All applicants need to respond to all of the questions. If a particular section is not applicable to your application, please say so; do not leave the question blank documentation if it is more convenient or insufficient space is specifically on

22Furtherinformatoin AppendixR

approved will need to be independently approved by the certifying agent before use (Refer flow chart Appendix 2 "inputs approval procedures). e The shredded green waste is then mixed with any Certified Inputs at the required ratio's, with either an excavator or a front end loader and then carted out to form a windrow. An ideal windrow size should be as follows: 2.5 ( ) 5m - 5 - page Remediation (NZ) Ltd RW-P-751-001-B Organic Production Protocols