Your search for 'regional explorer' returned 4357 results.

TRC South Taranaki Constituency Nomination Paper

page SOUTH TARANAKI GENERAL CONSTITUENCY NOMINATION PAPER To: Electoral Officer, Taranaki Regional Council PO Box 5135, Victoria Street West, Auckland 1142 A. For the TWO NOMINATORS to complete (Nominators must be electors on the electoral roll for the South Taranaki General Constituency) We, the undersigned electors of South Taranaki General Constituency nominate (enter candidate details): with their consent, as a candidate for Member of the South Taranaki General

TRC North Taranaki Constituency Nomination Paper

page NORTH TARANAKI GENERAL CONSTITUENCY NOMINATION PAPER To: Electoral Officer, Taranaki Regional Council PO Box 5135, Victoria Street West, Auckland 1142 A. For the TWO NOMINATORS to complete (Nominators must be electors on the electoral roll for the North Taranaki General Constituency) We, the undersigned electors of North Taranaki General Constituency nominate (enter candidate details): with their consent, as a candidate for Member of the North Taranaki General

TRC New Plymouth Constituency Nomination Paper

page NEW PLYMOUTH GENERAL CONSTITUENCY NOMINATION PAPER To: Electoral Officer, Taranaki Regional Council PO Box 5135, Victoria Street West, Auckland 1142 A. For the TWO NOMINATORS to complete (Nominators must be electors on the electoral roll for the New Plymouth General Constituency) We, the undersigned electors of New Plymouth General Constituency nominate (enter candidate details): with their consent, as a candidate for Member of the New Plymouth General Constituency

January 2022 hydrology report

page Doc. No: 2978685 TARANAKI REGIONAL COUNCIL MONTHLY RAINFALL AND RIVER REPORT FOR January 2022 Provisional Data Only Note: some sites record a number of parameters Table 1: Rainfall at 27 sites throughout the region Station Sub-region Monthly Year to Date Records Began Number of rain days (>0.5mm) Total Monthly Rainfall (mm) % of Monthly Normal (%) % of Normal for year to date Nth Egmont Ntnl Park (North) 6 68.0 17 1 Nov 1990 Dawson Falls

Freshwater & coast recreation survey 2019-2020

page Recreational Use of Coast, Rivers and Lakes in Taranaki State of the Environment Monitoring Report 2019-2020 Technical Report 2021-46 page Taranaki Regional Council Private Bag 713 Stratford ISSN: 1178-1467 (Online) Document: 2286600 (Word) Document: 2841687 (Pdf) November 2021 page Recreational Use of Coast, Rivers and …

FRODO 873604 v16 FORM Transfer or name change form

associated with the resource consent from the date of transfer. 10) Regardless of whether it is a transfer of consent or a name change only - both incur the same fee. 11) Please return signed transfer form to: consents@trc.govt.nz (if transfer form is emailed please do not post a hard copy unless requested to do so by the consents department.) Or by post to Taranaki Regional Council, Private Bag 713, Stratford 4352 If you wish to pay the transfer fee by internet banking the

TRC Annual Report 2020/2021 summary

page MIDWEEK 6 Oct 2021 P/O# 4500003438 4x Full pages M8X8, (25.4X36.6 cms width by height) incl Centrespread M8X16C, (53.1X36.6 cms width by height) est. $1337.92 +gst per/page Customer: TAR REGIONAL COUNCIL Caption: ANNUAL SUMMARY First Run Date: xxxxx Publication(s): NTH TARANAKI MIDWEEK Ad Number: xxxxxx Ad Size: M8X8, (25.4X36.6 cms width by height) Ad Number: xxxxxxxI Ad Size: M8X16C, (52.9X36.6 cms width by height) Ad Number:

Christian James McDean's evidence

page PP-863965-138-576-V1 IN THE MATTER of the Resource Management Act 1991 ("Act") AND IN THE MATTER of an application by Airport Farm Trustee Limited to the Taranaki Regional Council to renew an air discharge consent for a poultry farm at 58 Airport Drive, New Plymouth. STATEMENT OF EVIDENCE OF CHRISTIAN JAMES MCDEAN FOR AIRPORT FARM TRUSTEE LIMITED

December 2021 hydrology report

page Doc. No: 2955756 TARANAKI REGIONAL COUNCIL MONTHLY RAINFALL AND RIVER REPORT FOR December 2021 Provisional Data Only Note: some sites record a number of parameters Table 1: Rainfall at 27 sites throughout the region Station Sub-region Monthly Year to Date Records Began Number of rain days (>0.5mm) Total Monthly Rainfall (mm) % of Monthly Normal (%) Maximum December RF (year occurred) (mm) Total to date (mm) % of Normal for year to

Application attachment appendix K Hydraulic and Geotecnical Assessment Manawa Energy 14 Feb 2023

Motukawa Race – Hydraulic and Geotechnical Assessment – Motukawa Hydro-Electric Power Scheme RILEY Ref: 18MTK/ENH-C Page 3 25 November 2021 Riley Consultants Ltd 2.0 Description of Catchment and Setting The following section briefly describes the local landform and associated catchment. Further detail is provided in Appendix B. RILEY Dwg: 18MTK/ENH-201 presents the scheme location in a regional context and Table 1 provides a summary of the catchments. Table 1: Catchment Area