and behaviour to those catchments primarily in volcanic
geologies.
page
7
Tonkin & Taylor Ltd
Motukawa HEPS Consent Renewal - Sediment Assessment
Trustpower Ltd
November 2021
Job No: 1008726.2000.v3
Figure 2.2: Geological map of sub-catchments. Source: GNS 250K
page
8
Tonkin & Taylor Ltd
Motukawa HEPS Consent Renewal - Sediment Assessment
Trustpower Ltd
November 2021
Job No: 1008726.2000.v3
Detailed regional soil maps do not yet exist for the Taranaki
page
Resource Management Act 1991
Operative Coastal Plan for Taranaki
The Taranaki Regional Council has resolved, pursuant to clause 18(2) of the
First Schedule of the Resource Management Act 1991 (RMA), to adopt the
Proposed Coastal Plan for Taranaki (Interim Decisions Version – Incorporating
Environment Court consent orders) and the Minister of Conservation has
approved the Proposed Coastal Plan for Taranaki (Interim Decisions Version
Incorporating Environment Court consent orders)
many kilometres of the river as its
south-eastern boundary, has its interest recorded in the Taranaki Regional
Council’s 2010 Regional Policy Statement. That says the river takes its name from
Te Whaitara-nui-ā-Wharematangi-i-te-kimi-i-tana-matua-i-ā-Ngārue.6
The main Te Ara reference to Waitara says the name of Waitara town is said to be
derived from the story of Whare Matangi, the estranged son of Ngārue.7 He was
given a magic dart (tara) that would lead him to his father. After a
page
Document ID:RSHL-1877002180-2979 Version 2.0 Page 1
Regional Software Holdings Limited
Statement of Intent
2021/2022/2023
June 2020
Version 2.0
1 Introduction
This Statement of Intent is a declaration of the activities and intentions of Regional Software
Holdings Limited (RSHL). The statement outlines the Directors’ accountabilities to the shareholders
for corporate performance, as is intended by Schedule 8 of the
page
Ngā ākau tokatoka | Rocky shore
Taranaki Regional Council has surveyed six rocky shores
twice a year since 1985. We measure algae coverage, sand
coverage, reef habitat and identify all species present.
The rocky shore isn’t an easy place to live. Tides expose
organisms to changeable temperatures, long stretches of
dryness alternating with periods of submersion and
crashing waves. Sand inundation is an important factor,
with sand filling the
page
Business Process and Transformation Lead
Purpose | Te arotahi mātua
The Business Process and Transformation Lead plays a critical role in driving the Taranaki Regional
Council’s continued evolution by leading a cross functional project to document and analyse
current business processes and procedures, identify opportunities for streamlining and efficiency
and contribute to value stream mapping and transformation. This role is responsible for being a
key driver and
page
Greymouth Petroleum Turangi Ltd
Turangi-B Hydraulic Fracturing
Monitoring Programme
2019-2022
Technical Report 22-97
page
Taranaki Regional Council
Private Bag 713
Stratford
ISSN: 1178-1467 (Online)
Document: 2997913 (Word)
Document: 3133741 (Pdf)
March 2023
page
Greymouth Petroleum Turangi Ltd
Turangi-B Hydraulic Fracturing
Monitoring
page
OMV Taranaki Ltd
Maui Production Station
Monitoring Programme
Annual Report
2020-2021
Technical Report 2021-37
page
Taranaki Regional Council
Private Bag 713
Stratford
ISSN: 1178-1467 (Online)
Document: 2843362 (Word)
Document: 2880000 (Pdf)
November 2021
page
OMV Taranaki Ltd
Maui Production Station
Monitoring Programme
Annual
“regionally distinctive”
2. Secure a full range of sites that provide core habitat for threatened, at risk or regionally
distinctive species
3. Maintain the areal extent of systems that are historically rare or representative of a
threatened ecosystem type where native vegetative is now reduced to 20% or less for that
ecosystem type.
The priorities examine the adequacy of current protection given to our biodiversity assets. In so
doing, they highlight specific species and sites
page
193
CO AS TAL P L AN F O R TARANAK I S chedu le 7 – S ign i f i c an t s u r f b re aks
Schedule 7 – Significant surf breaks and Significant Surfing Area
This schedule identifies nationally, regionally and locally significant surf breaks and the Significant Surfing Area. Site locations are approximate only and are not intended to provide a
definitive location or extent of a site.
Schedule 7A – Nationally, regionally and locally significant surf breaks