production in
2006. The offshore Tui well was discovered in 2003 and
brought on-stream in 2008. Production from the
offshore Kupe field, first discovered in 1986,
commenced during 2010.
In April 2018, the Government announced an end to
offshore oil and gas exploration in New Zealand.
However, the decision does not affect existing permits.
The presence of oil and gas in the region has given rise
to industries involved in the processing, distribution,
announced an end to
offshore oil and gas exploration in New Zealand.
However, the decision does not affect existing permits.
The presence of oil and gas in the region has given rise
to industries involved in the processing, distribution,
use and export of hydrocarbons. Production stations or
gas treatment plants are found at Oaonui, Kapuni,
Waihapa, Rimu, Kaimiro and the McKee oil and gas
field. An ammonia urea plant is located at Kapuni, UF
resin plant at
page
25450739
BEFORE THE TARANAKI REGIONAL COUNCIL
IN THE MATTER of an application by Remediation (NZ)
Limited for resource consents under Part 5
of the Resource Management Act 1991
AND
IN THE MATTER applications to obtain replacement
consents for Consent Numbers 5838-2.2
and 5839-2 as summarised below:
Consent 5838-2.2 – to discharge of a) waste
material to land for composting; and b)
treated stormwater and leachate, from
composting
page
Todd Petroleum Mining Company Limited
KA1/7/19/20 Hydraulic Fracturing
Monitoring Programme Biennial Report
2016-2018
Technical Report 2018-14
Taranaki Regional Council
ISSN: 1178-1467 (Online) Private Bag 713
Document: 2053852 (Word) STRATFORD
Document: 2080938 (Pdf) August 2018
page
page
Executive summary
This report for the activities over the period November to December 2016
page
TO THE READERS OF TARANAKI REGIONAL COUNCIL’S SUMMARY
OF THE ANNUAL REPORT FOR THE YEAR ENDED 30 JUNE 2025
The summary of the consolidated annual report was derived from the
annual report of the Taranaki Regional Council (the Regional Council)
and its subsidiaries (the Group) for the year ended 30 June 2025.
The summary of the annual report comprises the following summary
statements on pages 2 to 4:
- the summary statement of financial position as at 30 June 2025;
- the
Terrace formation aquifer
• Whenuakura formation aquifer
• Matemateaonga formation aquifer
Generally, regional aquifers are recharged by rainfall infiltration. Limited investigations of aquifers in the
Eastern Hill Country suggests surface water recharge to groundwater can occur in the region, see Section
3.2.1(a). However, this has not been explored extensively in the wider region. A number of spring-fed
streams originate within the Te Papakura o Taranaki and at lower elevations across the …
page
1
BEFORE THE TARANAKI REGIONAL COUNCIL
IN THE MATTER of an application by Remediation (NZ)
Limited for resource consents under Part 5
of the Resource Management Act 1991
AND
IN THE MATTER applications to obtain replacement
consents for Consent Numbers 5838-2.2
and 5839-2 as summarised below:
Consent 5838-2.2 – to discharge of a) waste
material to land for composting; and b)
treated stormwater and leachate, from
composting
page
Working for the
Taranaki Regional Council
Always refer to the TRC Toolbox for the most
recent version of this document
Working for the Taranaki Regional Council
April 2016
Document 3084106
Approved by the Chief Executive
Updated 11 July 2022 by Anita Ng (updated Safe Driving policy)
Updated 8 August by Anita Ng (updated Flexible working arrangement policy and Whistle blowing procedure policy)
page
Remediation New Zealand Ltd
Uruti composting facility
Monitoring Programme
Annual Report
2020-2021
Technical Report 2021-81
page
Taranaki Regional Council
Private Bag 713
Stratford
ISSN: 1178-1467 (Online)
Document: 2924716 (Word)
Document: 2948168 (Pdf)
March 2022
page
Remediation New Zealand Ltd
Uruti composting facility
Monitoring Programme
Annual Report
page
Remediation New Zealand Ltd
Uruti composting facility
Monitoring Programme
Annual Report
2022-2023
Technical Report 2023-05
page
Taranaki Regional Council
Private Bag 713
Stratford
ISSN: 1178-1467 (Online)
Document: 3176864 (Word)
Document: 3202386 (PDF)
November 2023
page
Remediation New Zealand Ltd
Uruti composting facility
Monitoring Programme
Annual Report