Your search for 'rain fall' returned 1967 results.

Department of Conservation Code of conduct for Minimising Acoustic Disturbance to Marine Mammals from Seismic Survey Operations 2013

survey or will delay the start of operations, regardless of signal strength or whether distance or bearing from the acoustic source has been determined. Shutdown of an activated acoustic source will not be required if visual observations by a qualified MMO confirm that the acoustic detection was of a species falling into the category of ‘Other Marine Mammals’. 3.8.5 Observer deployment The preference for operational deployment of observers is on the acoustic source vessel. However, if

Remediation NZ Ltd consent monitoring 2018-2019

compliance monitoring. The inspection was undertaken with sampling of surface waters and soil. At the time of inspection approximately 11 mm of rain had fallen at the site overnight. This had resulted in the surface being damp and the Haehanga Stream and associated unnamed tributaries being turbid and slightly elevated. Weather conditions were still, warm with total cloud cover. Rain was falling intermittently throughout the sampling run. The inspection found that the paunch pond had approximately

Bikes on Buses

page Loading your bike Squeeze bike rack handle up to release lower rack. STEP 1 Lift bike onto rack with front wheel facing toward yellow support arm and fit wheels into clearly labelled slots. STEP 2 Raise support arm over front tyre so the hook rests on the top of the front wheel. STEP 3 Remove any loose items from the bike that could fall off while the bus is moving. Let the driver know you’re going to load your bike. Please remember that loading and

Bikes on buses

page Loading your bike Squeeze bike rack handle up to release lower rack. STEP 1 Lift bike onto rack with front wheel facing toward yellow support arm and fit wheels into clearly labelled slots. STEP 2 Raise support arm over front tyre so the hook rests on the top of the front wheel. STEP 3 Remove any loose items from the bike that could fall off while the bus is moving. Let the driver know you’re going to load your bike. Please

Value Timber Supplies Ltd Woodwaste Disposal Annual Report 2022-2023

Ltd (For a copy of the signed resource consent please contact the TRC Consents department) page Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section

SOE2022 Solid waste

year. The volume of waste to landfill peaked at 65,257 tonnes in 2013-2014 What we know and reduced significantly from 2015 when all three district councils aligned their recycling collection services and created a regional materials recovery facility in New Plymouth to process recyclables. In 2014, the waste to landfill in the region per person was 595kg falling to 311kg per person in 2020-2021. In Stratford and South Taranaki, there has been additional

Biennial report 2012-2014

contaminants. Only a pilot flare was operating. The API separator and all bunds and ring drains were clear. Everything was satisfactory. 1 November 2012 The site was inspected during fine weather with no significant rain having occurred for a week or more. The skimmer pits were clear and not discharging. The ring drains were free of contaminants and a frog was in residence at the top end of the drain. Some flaring was being undertaken, but this was very minor and no downwind effects were noted. The