Your search for 'rain fall' returned 1998 results.

Schedules of charges

year In stream temperature monitor $300.00 per year Portable (12v) groundwater pump $120.00 per day Suspended particulate sampler $30.00 per hour Vandorn sampler $50.00 per day Black disc $20.00 per deployment Bladder pump $450.00 per day Calibration test equipment $100.00 per hour Disposable bailer $20.00 per sample Peristaltic pump $120.00 per day Groundwater level logger $180.00 per year Groundwater probe $100.00 per day Rain gauge calibration $300.00 per deployment Automatic water

Annual Report 2016-2017

managed, and the tip face appeared stable. No cracking or slumping was evident on either the fill area or the tip face. The pre-fill gully was well grassed with no sign of sediment runoff. The stormwater drains were grassed and contained minor amounts of stormwater following heavy rain the previous day. The stormwater ponds were moderately full, and the final pond was discharging at a trickle flow. There was no visible effect noticeable in the receiving waters downstream of the discharge. Silt

Annual report 2016-2017

Settlement (13 December 2016) 11 January 2017 Conditions were fine with a moderate westerly wind. It had rained in the catchment in the two days preceding the inspection. The camp was reasonably quiet during the inspection, with seven camping parties present on site. There was no weed coverage on the western filter bed and low coverage on the eastern bed. There was a small amount of ponding on the western bed (<5% of the surface) and no ponding on the eastern bed. There was a noticeable

Annual report 2013-2014

summary of historical bacteriological results from January 1993 to January 2013 is presented in Table 3. The results of the bacteriological monitoring undertaken during the 2013-2014 summer monitoring period are presented in Table 4. Although it was not raining on the morning of sample collection (9 January 2014) there had been heavy rainfall overnight which is reflected in the high faecal indictor bacteria counts obtained (Table 4). Table 3 Summary of previous bacteriological results

Council meeting agenda August 2018

K Raine N W Walker C S Williamson Apologies Notification of Late Items Item Page Subject Item 1 4 Confirmation of Minutes Item 2 16 Consents and Regulatory Committee Minutes Item 3 22 Policy and Planning Committee Minutes Item 4 30 Executive, Audit and Risk Committee Minutes Item 5 35 Remuneration Authority Information Paper: Determining the Remuneration of Local Government Elected Members - Oversight of Issues; and Local Government Members (2018/19)(Local

Policy and Planning February 2023 web version

previous monitoring carried out between 2016 and 2020 that show PM2.5 concentrations are consistently very low at the Central School site. 25. Under MfE’s grading criteria, 96% of daily mean concentrations measured at the site achieved either an ‘excellent’ or a ‘good’ grading across the 2016 to 2021 period, with all but one day of the remaining 4% falling into the ‘Acceptable’ category. 26. The annual mean concentration of PM2.5 at the Central School site across the 2016-2021 period was 4