potential to be contaminated, drains into the
stormwater pond under gravity and is then pumped to the effluent treatment plant and discharged via the
marine outfall. Stormwater from the tankage area is pumped over into the process sewers which flow to the
storm pond. The stormwater falling on the non-process areas of the western half of the site (Figure 1) is
directed by “v” ditches running alongside the roads to a dam/pond and then out to the Tasman Sea via the
Manu Stream. Stormwater falling on
The site is approximately 2.4ha in size
and comprised of cutover semi-coastal Tawa, kohekohe, rewarewa, hinau, podocarp forest remnants on
hill slopes, flat land and stream terraces. The remnants are of a native forest type that is classified as
'Chronically Threatened' in Taranaki and falls within 'Acutely Threatened' Land Environment (LENZ)
F5.2b. Remnants such as this provide important habitat for common, rare and threatened species. Barrels
Creek contributes good connectivity with other
page
Loading your bike
Squeeze bike rack handle
up to release lower rack.
STEP 1
Lift bike onto rack with front
wheel facing toward yellow
support arm and fit wheels
into clearly labelled slots.
STEP 2
Raise support arm over front
tyre so the hook rests on the
top of the front wheel.
STEP 3
Remove any loose items from
the bike that could fall off
while the bus is moving. Let
the driver know you’re going
to load your bike.
Please remember that loading
and
page
Loading your bike
Squeeze bike rack handle
up to release lower rack.
STEP 1
Lift bike onto rack with front
wheel facing toward yellow
support arm and fit wheels
into clearly labelled slots.
STEP 2
Raise support arm over front
tyre so the hook rests on the
top of the front wheel.
STEP 3
Remove any loose items from
the bike that could fall off
while the bus is moving. Let
the driver know you’re going
to load your bike.
Please
Consents & Regulatory Committee agenda June 2021
person may take, use, dam or divert any
water, unless the activity is expressly allowed for by a resource consent or a rule in a
regional plan, or it falls within some particular categories set out in Section 14.
Vector Ltd holds water permit 1125-4 to take water from Kapuni Stream for the
operation of a gas processing facility and related ancillary purposes and downstream
uses. This permit was issued by the Council on 19 June 2012 under Section 87(d) of
the RMA. It is due to expire on 1 June
140 cfu/100ml on 12 January 2010, this was
likely caused by elevated river flows following rain in the preceding few days.
4.1.5.1 Compliance with guidelines
Compliance with the 2003 guidelines for marine contact usage is summarised in
Table 12.
Table 12 Bacterial guidelines performance at Onaero Beach
Number of exceedances of enterococci guidelines [ % of 20 samples]
Parameter ALERT
Single sample 141-280/100ml
ACTION
Two consecutive samples >280/100 ml
October 2012
and 20 March and 12 June 2013.
Notes from these visits are listed below. Records of production and incinerator
operation were inspected and found to be satisfactory.
16 August 2012
There were light rain showers, and a blustery W wind. Yellow pollen was present on
the surface and at the edges of the storm ponds. Herekawe Stream was in low fresh,
slightly turbid, with no foam beyond the mixing zone. The (combined
DAS/municipal) stormwater discharge had noticeable “road” odour.
Cheal Production Station Annual Report 2023-24
the treatment of gas at the McKee LPG Plant and the
Mangahewa Extraction Train 2 (MET2).
July
2009
June
2021
June
2039
1.3.1 Water abstraction permit
Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is
expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular
categories set out in Section 14.
The Company holds water abstraction permit 1226-1 to take water from