Draft Annual Plan 2017/2018
Draft Annual Plan 2017/2018.
Draft Annual Plan 2017/2018.
Impact Assessment & Cost-Benefit Analyses of Proposed Regional Pest Management Plan.
Taranaki Regional Council Annual Plan 2017/2018.
Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.
Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.
processing. page 6 Photo 3 Ngatoro-B wellsite page 7 2. Kaimiro Production Station 2.1 Resource consents 2.1.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. During the period under review, GPL held water
extended-duration nuisance blooms reflecting high nutrient enrichment and/or significant alteration of the natural flow regime or habitat. * The productive class is defined by River Environment Classification (REC) types, with a combination of dry climate categories and soft-sedimentary, volcanic acidic and volcanic basic geology. All sites that do not fall in these categories are in the default class. 1.3 Periphyton Periphyton is the ‘slime’ and algae found on the beds of lakes and rivers. This
The site is approximately 2.4ha in size and comprised of cutover semi-coastal Tawa, kohekohe, rewarewa, hinau, podocarp forest remnants on hill slopes, flat land and stream terraces. The remnants are of a native forest type that is classified as 'Chronically Threatened' in Taranaki and falls within 'Acutely Threatened' Land Environment (LENZ) F5.2b. Remnants such as this provide important habitat for common, rare and threatened species. Barrels Creek contributes good connectivity with other
Regional Transport agenda September 2021