Your search for 'rain fall' returned 2021 results.

Methanex Motunui and Waitara Valley Combined Monitoring Annual Report 2020 2021

into the process sewers which flow to the storm pond. The stormwater falling on the non-process areas of the western half of the site (Figure 1) is directed by “v” ditches running alongside the roads to a dam/pond and then out to the Tasman Sea via the Manu Stream. Stormwater falling on the eastern side of the site is directed to unnamed tributaries of the Waihi Stream via outfalls and a small sedimentation pond. Sludge from the storm pond, off-spec pond and blow down pond stored in lagoons

STDC Waiinu Beach Settlement Annual Report 2023 2024

Appendix I Resource consents held by South Taranaki District Council (For a copy of the signed resource consent please contact the TRC Consents department) page Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the

WestSide New Zealand Rimu Production Station Annual Report 2023 2024

Resource consents held by WestSide New Zealand (For a copy of the signed resource consent please contact the TRC Consents department) page Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are

Form 520: Certificate of compliance

page 06/22- #650412 Page 5 of 8 4.4 State the relevant regional plan[s] and rule[s] numbers this application falls under. Regional Fresh Water Plan  Rule Number[s] ___________________________________ Regional Air Quality Plan  Rule Number[s] ___________________________________ Regional Coastal Plan  Rule Number[s] ___________________________________ Regional Soil Plan  Rule Number[s] ___________________________________ No Specific Rule  [eg,

Greymouth Petroleum southern sites consent monitoring 2017-2018

1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. GPL holds water abstraction permit 5384-2 to take groundwater from the Matemateaonga Formation for use in enhanced hydrocarbon recovery activities at the Kaimiro-O wellsite. This permit was first issued by the