Your search for 'rain fall' returned 1983 results.

Greymouth Petroleum southern sites consent monitoring 2017-2018

1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. GPL holds water abstraction permit 5384-2 to take groundwater from the Matemateaonga Formation for use in enhanced hydrocarbon recovery activities at the Kaimiro-O wellsite. This permit was first issued by the

Annual report 2013-2014

Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.

Annual report 2014-2015

Trustpower Mangorei hydro scheme consent monitoring report - Taranaki Regional Council.

Annual report 2013-2014

processing. page 6 Photo 3 Ngatoro-B wellsite page 7 2. Kaimiro Production Station 2.1 Resource consents 2.1.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. During the period under review, GPL held water

Manawa Energy Motukawa HEP Scheme Annual Report 2021-2022

Much of the scheme is monitored and operated remotely by the Company. Through an automated water level sensor system, the Company can monitor the residual flows in the Manganui River and Mangaotea Stream, water levels in the race and lake and how much rain is falling locally. This has allowed the Company to manage race flows to minimise flooding, and has greatly improved the Company’s compliance with residual flow requirements. Resource consents The Company holds 24 resource consents,