SDC Stratford WWTP Annual Report 2023-2024
SDC Stratford WWTP Annual Report 2023-2024
SDC Stratford WWTP Annual Report 2023-2024
page Doc. No: 2813485 TARANAKI REGIONAL COUNCIL MONTHLY RAINFALL AND RIVER REPORT FOR June 2021 Provisional Data Only Note: some sites record a number of parameters Table 1: Rainfall at 27 sites throughout the region Station Sub-region Monthly Year to Date Records Began Number of rain days (>0.5mm) Total Monthly Rainfall (mm) % of Monthly Normal (%) Total to date (mm) % of Normal for year to date % of average full calendar year Nth Egmont
amend the current consent. The site has not been used in recent years. The discharge site is approximately 120 m long and 25 m wide, and is shown in Figure 2. Patea Beach is an elevated site which for most of the time is dry. Rain that does fall on the site drains away at a very rapid rate. The site does not suffer from flooding from rain or tidal action, due to its elevation. 1 The Council has used these compliance grading
Got a special block of bush or wetland area on your land? It might fall into our Key Native Ecosystem (KNE) programme and qualify for a free Biodiversity Plan. Protecting native habitats relies on effective planning to ensure all aspects of management are considered. For example it's no good killing the predators if meanwhile old man's beard is smothering the canopy. To help owners protect KNEs on their land, the Council prepares free Biodiversity Plans for KNEs that fall either wholly or
Got a special block of bush or wetland area on your land? It might fall into our Key Native Ecosystem (KNE) programme and qualify for a free Biodiversity Plan. Protecting native habitats relies on effective planning to ensure all aspects of management are considered. For example it's no good killing the predators if meanwhile old man's beard is smothering the canopy. To help owners protect KNEs on their land, the Council prepares free Biodiversity Plans for KNEs that fall either wholly or
There were plenty of April showers last month with nearly 775mm of rain at the North Egmont Visitors Centre and 574.5mm at Dawson Falls. Rainfall was on average 101.8% of the long-term average, and ranged from 65% at Taungatara at Eltham Rd and Oeo u/s Awatuna Wetland, to 192% at Matarawa at Matarawa Valley. Year to date rainfall is sitting between 103% (Mangati at SH3) and 206% (Matarawa at Matarawa Valley) with an average of 139.7% of normal. Mean river flows were 133.8% of typical values,
page Doc. No: 2906170 TARANAKI REGIONAL COUNCIL MONTHLY RAINFALL AND RIVER REPORT FOR October 2021 Provisional Data Only Note: some sites record a number of parameters Table 1: Rainfall at 27 sites throughout the region Station Sub-region Monthly Year to Date Records Began Number of rain days (>0.5mm) Total Monthly Rainfall (mm) % of Monthly Normal (%) Total to date (mm) % of Normal for year to date % of average full calendar year Nth
the best level of control. The technicians use weather forecasting to predict the lime dose, for example reducing the lime does set point if heavy rain is forecast. However, the weather forecasts have not always eventuated which sometimes results in quadrants being under-dosed. The technicians continue to focus on pH control to achieve target dose ranges. • The outfall pump station was working well and only routine maintenance work was required to be undertaken. • NPDC
page Doc. No: 2955756 TARANAKI REGIONAL COUNCIL MONTHLY RAINFALL AND RIVER REPORT FOR December 2021 Provisional Data Only Note: some sites record a number of parameters Table 1: Rainfall at 27 sites throughout the region Station Sub-region Monthly Year to Date Records Began Number of rain days (>0.5mm) Total Monthly Rainfall (mm) % of Monthly Normal (%) Maximum December RF (year occurred) (mm) Total to date (mm) % of Normal for year to
and leachate. page 6 2. Results 2.1 Inspections The site was inspected on two occasions. The inspections focussed on the type of material being discharged, discharge site stability and leachate/stormwater control. 7 November 2012. A site visit was made to conduct a compliance monitoring inspection. The weather was fine with no rain falling over the previous 48 hours. There did not appear to be any new greenwaste discharged at the site since the