Your search for 'rain fall' returned 1998 results.

Regional landscape study of the Taranaki coastal environment

by the Resource Management Act 1991 (RMA). However, constraining attention only to resource management issues which fall within the CMA fails to recognise the integrated nature of the wider coastal environment. For this reason, it is proposed to extend the coverage of the reviewed Coastal Plan to include the wider coastal environment. While values inland of the CMA can be recognised through the Coastal Plan, rules will only apply within the CMA area where the Council has

reg landscape study of naki coastal enviro

by the Resource Management Act 1991 (RMA). However, constraining attention only to resource management issues which fall within the CMA fails to recognise the integrated nature of the wider coastal environment. For this reason, it is proposed to extend the coverage of the reviewed Coastal Plan to include the wider coastal environment. While values inland of the CMA can be recognised through the Coastal Plan, rules will only apply within the CMA area where the Council has

Annual report 2014-2015

water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. page 6 Trustpower holds water permit 0489-2 to cover the damming and diversion of the Patea River from Lake Rotorangi through the intake and spillways. This permit was issued by the Council on 25 June 2009 under Section 87(e) of the RMA, and following appeal, commenced on 17 December 2010. Trustpower

Remediation NZ Ltd consent monitoring 2019-2020

2 Results 2.1 Inspections 30 July 2019 An inspection was undertaken under consent 5838-2.2 (this is the discharge to land consent) as part of routine compliance monitoring. The inspection was carried out in fine weather conditions following rain within the previous 24 hours. The surface water bodies across the site were elevated, swift and turbid. An inspection of the site found that the irrigation areas were wet with standing water observed on the uppermost irrigation area. …

Appendix J - organic composting protocols (vermiculture only)

“customer site” for a. A minimum of 3 weeks, before spreading (no turning required). page Remediation (NZ) Ltd RW-P-751-001-B Organic Production Protocols Greenwaste Composting & Vermiculture - 8 - b. A cover should be applied to reduce excess moisture retention from rain events. c. The Revital contract spreader will ensure that before the product is spread it has met 2(a) above, and the spreading records will be filed as part of the

SOE2022 River Water Quality

growth of multiple species and approaching acute impact level for sensitive species at higher concentrations). The national bottom line sits between bands B and C. For nitrate, all 15 sites monitored in Taranaki achieved national bottom lines, with all but three falling in band A for both the annual median and 95th percentile measures. The sites in band B were in mid and lower parts of southern ring plain catchments, which are areas of more intensive pastoral

SOE2022 Lakes Wetlands

When compared to criteria set out in the National Objectives Framework (NOF), Lake Rotorangi falls within band B for TLI Score Description Classification 0 - 2 Microtrophic: The lake is very clean with very low levels of nutrients and algae. The lake can have snow or glacial sources. Very good >2 - 3 Oligotrophic: The lake is clear and blue, with low levels of nutrients and algae Good >3 - 4 Mesotrophic: The lake has moderate levels of nutrients and algae. Fair >4 - 5

Taranaki By Products Air and Water Annual Report 2021-2022

stock. There were issues around keeping buried product in the ground due to elevated groundwater levels, the officer noted that the pits appeared to be well managed. At the time of the inspection a discharge pipe to pond 1 had been damaged and product is leaking into the ground. TBP was advised that this needed to be resolved before the next inspection. 4 May 2022 At the time of the inspection, the inspecting officer was advised that heavy rain had contributed to high groundwater levels

Taranaki Tsunami Inundation Analysis

geographic information system. These layers may be used to assist in developing maps showing evacuation areas, in accordance with the Ministry of Civil Defence and Emergency Management guidelines. 2 Method of Analysis A typical tsunami wave analysis usually includes a method of generating the offshore waves using a model which simulates underground movement of the earth (an earthquake or underwater landslide), which then causes the rapid rise or fall of the water surface, which then