Your search for 'rain fall' returned 2001 results.

SEM Lake Rotorangi Annual Report 2020-2021

observations made on each of the sampling occasions during the period under review are presented in Table 5. Table 5 Observations at Lake Rotorangi monitoring sites on sampling occasions during 2020-2021 Date Lake level (m asl) Weather Wind Lake appearance L2 L3 L2 L3 16 Oct 2020 76.78 Fine, rain 3 days prior Light NE breeze No wind Turbid, brown- green; surfaced rippled Turbid, green- brown; surface rippled 25 Feb 2021 76.65 Fine, dry weather preceding

Todd Petroleum Ltd Mangahewa G Hydraulic Fracturing Report 2021-2022

Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may discharge any contaminant

Long-Term Plan 2018-2028 (Final draft pending approval)

the New Plymouth District Council on a paper road down the coast, as an integral part of the Taranaki Crossing. This link would include a treetop canopy walk across a rain forested valley.  To also invest directly in the Kaitake Trail proper.  To complete outer tracks and a lookout at Pukeiti to complement the Taranaki Crossing. page 5  To establish a family tramping hut within Pukeiti, as well as a new link to nearby commercial accommodation. WHAT IT MEANS

Long-Term Plan 2018/2028

Kaitake Trail being developed by the New Plymouth District Council on a paper road down the coast, as an integral part of the Taranaki Crossing. This link would include a treetop canopy walk across a rain forested valley.  To also invest directly in the Kaitake Trail proper.  To complete outer tracks and a lookout at Pukeiti to complement the Taranaki Crossing.  To establish a family tramping hut within Pukeiti, as well as a new link to nearby commercial accommodation. page

Consents issued 26 May-13 July 2017

Water - Animal Waste Dairy Farm Replace R2/1982-3.0 Medley Partners Land - animal waste Dairy Farm Replace R2/3720-2.1 PJ & RE Roberts Family Trusts Land - animal waste Dairy Farm Change R2/3201-2.1 Juloss Partnership Land - animal waste Dairy Farm Change R2/5056-2.0 Te Rere o Kapuni Limited - T/A Dawson Falls Mountain Lodge Land - Misc Sewage Treatment Replace R2/1078-3.0 Tosland Trusts Partnership Land - animal waste Dairy Farm Replace R2/3516-3.0 MJ Corric Estate Land -

Ōpunake Flood Control Scheme Asset Management Plan

hectares (248 ha in the Hihiwera and 69 ha in the Allison Street catchment. The most upstream extent of the catchment lies only 4.5 km to the northwest of the Opunake Township with the land falling at a relatively uniform grade over its total length. The stream channels are therefore not directly affected by rainfall events on Mount Taranaki but it is clear that the mountain affects the nature of rainfall events. The catchment is almost exclusively used for dairy farming with very