Your search for 'rain fall' returned 1977 results.

New Plymouth Christmas Parade bus timetable

Depart Ariki St The Warehouse BBK Parklands Ave BBK Richmond St Queen St 3.00 pm 3.15 pm 3.18 pm 3.51 pm 3:56 pm P A R A D E 1 -2 P M *Route 20 – Waitara/Bell Block/NP (does not go to the Valley) FREEBUS Christmas Parade Rain date Sunday 1st December to the NOVEMBER 30 SATURDAY *routes run as per normal and stop at all stops*routes run as per normal and stop at all stops << /ASCII85EncodePages false /AllowTransparency false

NPDC Colson Road Landfill Annual Report 2022-2023

by NPDC that relate to the Colson Road landfill 14 Table 2 Monitoring programme objectives and programme development methodology 15 Table 3 Summary of monitoring activity for 2022-2023 16 page iii Table 4 Chemical analysis of Colson Road landfill combined site leachate discharge 33 Table 5 Results of analysis of under liner drainage for the year under review. 35 Table 6 Results of rain event monitoring – discharge and Puremu Stream samples, 1 June 2023 40

Report 2013

or it falls within some particular categories set out in Section 14. The Council determined that the application to take groundwater fell within Rule 49 of the Regional Freshwater Plan for Taranaki (RFWP) as the rate and daily volume of the groundwater abstraction may have exceeded that of the permitted activity (Rule 48). Rule 49 provides for groundwater abstraction as a controlled activity, subject to two conditions: • The abstraction shall cause not more than a 10% lowering of

Annual report 2014-2015

levels in the race and lake and how much rain is falling locally. This has allowed Trustpower to manage race flows to minimise flooding, and has greatly improved Trustpower’s compliance with residual flow requirements. page 5 Figure 1 Main features of the Trustpower Motukawa HEP Scheme including relevant consents page 6 1.3 Resource consents 1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam

Annual report 2013-2014

Waitaha catchment consent monitoring report - Taranaki Regional Council.

McKee Mangahewa Production Station Annual Report 2021-2022

site was going to be scraped to remove proppant, and to also level out the site post drilling campaign. Heavy rain earlier in the week had carried sediment into the ring drains and down to the wetland. Some of the ring drains were visibly turbid, while others contained clear water as the sediment had been filtered since the rain event. The bank separating the wetland from the site had undergone major works to stabilise it and had been covered with coconut matting and hydroseed. The wetland had

22 08 19 news release 1 ECC and EOC activated draft 2

embedded:image1.png MEDIA RELEASE 1 IMMEDIATE RELEASE 19 August 2022, 11:30am Civil Defence responds to severe weather event Taranaki’s Civil Defence Emergency Co-ordination Centre (ECC) and the New Plymouth Emergency Operation Centre (EOC) have activated in response to the severe weather event that is hitting the region. More than a metre of rain has fallen on Mount Taranaki causing significant flows down all rivers resulting in several families voluntarily

Annual Plan 2025/2026

fields making up a major part of New Zealand’s natural gas resources. Extensive drilling programmes have continued to support the Kapuni and Maui fields. page 2025/2026 Annual Plan 10 Strategic priorities Ko ngā rautaki matua Strategic priorities With the above changes in our operating environment in mind, we are conscious of the need to adjust our priorities. We see the need for these adjustments falling primarily in the following focus areas: • Partnering

Stanley Bros Trust Piggery Annual Report 2021/22

applied (mm) m3 of effluent Total 105.1 - 24,083 2.3.2.3 Method of irrigation The effluent from the piggery is pumped to storage pond prior to land application. The Company communicated that three different delivery systems were used during the 2021-2022 monitoring year: 1. Dribble bar – main method of effluent application, depths applied (~3 mm) 2. ‘Weta’ travelling rain gun – used to apply effluent to the Sand Dune block at 8mm depths during 8 months of the year. 3. Slurry tank