Your search for 'rain fall' returned 1989 results.

13Furtherinformation AppendixI

elevated soil moistures in the range of 44 and 45 %. Conversely, prior to January 8th 2015, Uruti received only 1 mm of rain in the previous eight days, with soil moistures at 32 %, this would have resulted in minimal outflow ‘gaining’ from the Haehanga Stream to the groundwater table. page 14745-1 Commercial in confidence 6 6/2015 Table 2.4:Stream and Groundwater Elevations (msl) Date Bore Bore elevation Stream Elevation GW elevation Groundwater

Annual report 2015-2016

officer would make contact shortly for an update on the anticipated level of use of the discharge area. 26 January 2016 The weather was fine and dry at the time of inspection (only 39 mm of rain had fallen over the past month). The Company was contacted prior to the inspection. It was again found that, there did not appear to have been much activity at the site since the last inspection. However, the stock pile area did contain several loads of green waste ready for spreading. No

Schedules of charges

particulate sampler $30.00 per hour Vandorn sampler $50.00 per day Black disc $20.00 per deployment Bladder pump $450.00 per day Calibration test equipment hire $100.00 per hour Disposabale bailer $20.00 per sample Peristaltic pump $120.00 per day Rain gauge calibration $300.00 per deployment Automatic water quality samplers $50.00 per day Betrand Rd telemetry $2,000.00 per year Lake Rotorangi telemetry $1,752.00 per year Mangati Stream telemetry $2,900.00 per

Annual report 2014-2015

unacceptable materials, the stability of the green waste stacks (against wind), and the management of any stormwater and leachate. page 8 2. Results 2.1 Inspections 27 August 2014 The site was inspected in fine conditions with a moderate southerly breeze. The last rain was five days prior to this inspection. The consent holder was met off site prior to the inspection. The consent holder outlined that the last delivery of green waste from Ingram’s was about three or

Biennial report 2011-2013

directed into the settling ponds. Midhurst CD Boyd quarry Tariki page 5 Figure 2 CD Boyd Surrey Road, Quarry site 1.4 Resource consent 1.4.1 Water abstraction permit Section 14 of the Resource Management Act stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14.

Tamarind Sidewinder Annual Report 2021-2022

persistent rain and strong winds prior to the inspection and it was raining heavily at the time of the inspection. The stormwater system was working well, with all stormwater being collected and directed for treatment prior to discharge from the site. The site was tidy and processes appeared to be well managed with no spills or stains evident on the ground. Operationally good practices were being adhered to with drip trays and chemical bunding in use. The skimmer pits were full, free of hydrocarbon

STDC Hawera Municipal Oxidation Ponds Annual Report 2021-2022

marine outfall discharge on the local intertidal communities were not evident from the 2022 summer survey results. Two potential impact sites had greater species richness and diversity results than the control site, Waihi Reef, while the other site (350 m NW of the outfall) had recently experienced a natural rock fall event and was buried by large boulders and other debris. Seven years ago, the site 200 m SE of the outfall was also buried during a rock fall event. Species richness and diversity

Council meeting agenda July 2019

H McIntyre N W Walker C S Williamson (via Zoom) Apologies B K Raine M G Davey Notification of Late Items Item Page Subject Item 1 3 Confirmation of Minutes Item 2 10 Consents and Regulatory Committee Minutes Item 3 15 Policy and Planning Committee Minutes Item 4 21 Regional Transport Committee Minutes Item 5 27 Executive Audit and Risk Committee Minutes Item 6 31 Joint Committee Minutes Item 7 46 Taranaki Stadium Trust: Yarrow Stadium Major

SH3 Working Party Booklet 2024

was also some replacement of square kerbing with radial. Mangaotaki Rockfall (2008) Heavy rain triggered a large rock fall on 4th August 2008 at the Mangaotaki Bluffs. The large rocks blocked SH3 for almost 48hrs and a route detour through local council roads was required during this time.  Two stock truck effluent disposal facilities have been built along the route, one in each of the regions – the Taranaki one at Ahititi on the northern