Your search for 'rain fall' returned 2010 results.

TRC Gardens summer events calendar 24/25

in a safe space. Yours Truly shares stories of youth, multi-culturalism, feminism, LGBTQI+, community, mental health journeys and the environmental issues we face. Outdoor nature bingo Hollard Gardens - 10am to 11.30am Get your tamariki outdoors these school holidays. Grab their gumboots and explore the magic of Hollard Gardens with nature bingo. Rain or shine - puddle jumping optional. Recommended for children 5–10 yrs and must be accompanied by an adult. Outdoor

STDC Waiinu Beach Settlement Annual Report 2021-2022

Site inspections 17 December 2021 - The camp was quiet at the time of inspection with only one bus, one motorhome and two caravans in residence. The STDC officer noted that the holding tanks had been full as a result of heavy rain but had reduced the following day. While there have been odour complaints in the past, at the time of inspection there were no odours or visual issues near the WWTP or trenches. The sea was a turbid brown at the time, and there had been lots of rain preceding the

Consents and Regulatory Committee Agenda August 2022

the NPS- FM objective. Given that the Council can only consider policies that relate to the matters over which the Council has reserved control through the plan itself, the Council is unable to take into account matters that fall outside this scope. You will be aware that, with few exceptions, when a dairy consent involving a discharge to water is replaced, the Council only allows the water discharge to continue until 1 December 2022, then the only discharge allowed is to land.

Concrete Plants Annual Report 2023-2024

be well managed. However, one discharge sample taken during the year under review was non-compliant with consent condition 7. The reading of 172g/m3 exceeded the consent limit of 100g/m3. The consent holder was notified and asked to investigate the cause of the exceedance. The investigation found that the yard settling pond contained a large amount of sediment, which resulted in an increase in turbidity after heavy rain events. The settling pond underwent a deep clean and subsequent testing

Central Greenwaste & Firewood consent monitoring 2018-2020

the contained area or soak hole, even in the heavy rain occurring at the time of inspection. Overall the site looked tidy and appeared to be well managed at the time of inspection. 21 February 2019 The site has had a few new loads of green waste placed on it. There was no evidence of any stormwater or leachate discharge on site and there was nothing collected in the contained corner of the site. Overall the site was being managed in an appropriate manner at the time of inspection. …

Mangati Catchment Joint Monitoring Programme Annual Report 2020 2021

is approximately 6.1 km2. The length of the catchment, from the headwaters between Paraite and Corbett Roads to the sea at Bell Block beach, is approximately five kilometres. The industrial area at Bell Block is situated mid-catchment (Figure 1). Historically, the industrial areas were located predominantly on the western side of the stream however ongoing development since 2016 has resulted in more sites on the eastern side. These sites fall under permitted activity rules and are not

Water metering and reporting

installed as per manufacturer's specifications or as outlined in the Water Measurement Code of Practice. You must provide an installation certificate to the Council following any new installation. Verification of water metersFor measuring and reporting to be useful, we must be able to rely confidently on the water-take data we get. All water meters that fall under the national regulations or under resource consent requirement must be verified to be accurate to within ± 5%. Verification is required

Water metering and reporting

installed as per manufacturer's specifications or as outlined in the Water Measurement Code of Practice. You must provide an installation certificate to the Council following any new installation. Verification of water metersFor measuring and reporting to be useful, we must be able to rely confidently on the water-take data we get. All water meters that fall under the national regulations or under resource consent requirement must be verified to be accurate to within ± 5%. Verification is required