between inlet works and
screenings building blocked up
with rags causing wastewater
discharge.
N No
Blockage cleared, site cleaned
and sanitised. Procedures
updated to prevent
reoccurrence.
22 August
2022
Heavy rainfall caused high flows
at the inlet works overwhelming
band screens
N No
Problem resolved as rain
eased and inflows reduced.
22 August
2022
High rainfall caused Clarifier 3 to
overwash. N No
Overwash stopped as rain
eased.
26
Company
communicated that two different delivery systems were used during the 2023/24 monitoring year:
1. Dribble bar – main method of effluent application, depths applied (~3mm)
page
12
2. ‘Weta’ travelling rain gun – used to apply effluent to the Sand Dune block at 8-10mm depths during
7 months of the year.
Type of crops grown
Two crops were grown under the cut and carry system in 2023/24. Maize Silage paddocks (37.2ha) which
were cultivated in October and
sites were inspected on three occasions
during the monitoring year. A summary of the notes made during these inspections is
given below.
2.1.1 9 August 2012
A site visit was made to conduct a compliance monitoring inspection. It was raining at
the time of the inspection with 14 mm falling over the past 72 hours.
A meeting was held at the site office with the director of the Company to discuss the
new consents. The requirement to provide management plans was also discussed.
Monk
site. The consent (7645-1) is held by Alby M Limited,
and compliance monitoring of consent 7645-1 is not included in this report
page
6
Results
2.2.1 Inspections
21 September 2022
It was raining with a light breeze at the time of the inspection. The cap was in good condition and was
showing no signs of slumping. There was some ponding present, but the inspection was during a rain event,
thus this would be expected. There was evidence of good stock rotation and
however the bung was missing allowing rainwater and possibly contaminants to discharge onto the ground.
One solution would be to place an oliophillic mat below the pump to capture any hydrocarbon while
allowing rainwater to drain, this was discussed with staff at the time of the inspection. Also discussed was
the purposed and use of plastic matting under the rig. For some areas plastic matting is suitable, however
for others the matting needs to be used to capture solid/liquid that falls from the
stormwater falling on the non-process areas of the western half of the site (Figure 1) is
directed by “v” ditches running alongside the roads to a dam/pond and then out to the Tasman Sea via the
Manu Stream. Stormwater falling on the eastern side of the site is directed to unnamed tributaries of the
Waihi Stream via outfalls and a small sedimentation pond.
Sludge from the storm pond, off-spec pond and blow down pond stored in lagoons 2, 3, and 4 was
removed during 2006. The sludge in lagoon 1 is …
review of the Regional Freshwater Plan, the Committee was told. Overseer was never designed or intended for use as a regulatory tool, but solely for use at individual farm-management level. Seven regional councils currently make use of Overseer as a regulatory tool in some way. TRC is among the nine which do not use it. PCE's report on Overseer Nutrient Management Tools/Models (2015 report for TRC) Value of native bush recognisedA fifth of the privately owned native bush in Taranaki now falls under
reduced as rain
eased. An incident report was
provided by NPDC. An
infringement notice was issued.
2.3.2 Sewage pump station incidents
There were no unauthorised discharges from sewage pump stations (SPSs) during the 2023/24 monitoring
year.
2.3.3 Reticulation overflow incidents
Five unauthorised discharges to surface water occurred due to overflows in the reticulation network during
the 2023/24 monitoring period (Table 18).
page
18
NPDC has continued work
during an exceptional rain event. Investigation found compliance
with the relevant consent.
Abstraction volumes complied with the consent limit. Telemetry of abstraction data to
Council was installed in October 2012, with provision for transmission of cooling water flow
and temperature data in the future, if required.
Graeme Lowe Protein Ltd (meat rendering plant) demonstrated an overall high level of
environmental performance.
The Company holds four resource consents, to allow it to
sound? Are they practical, efficient and reasonable? And most importantly, what impacts will they have on families and communities? The information supplied so far by the Government and its advisers would appear to fall short of adequately answering these questions. We hope that Wellington will give the Taranaki experience the careful consideration we believe it deserves. A major concern is that as they stand, the Government’s proposals would frustrate and set back the good work happening here. The