the activity is expressly allowed for by a resource
consent or a rule in a regional plan, or it falls within some particular categories set out
in Section 14.
page
11
SENZL holds coastal permit 5992-1 to take produced water and associated heat from
aquifers in the coastal marine area associated with hydrocarbon exploration and
production activities. This permit was issued by the Taranaki Regional Council on 16
June 2003 under Section 87(c) of the RMA. It is due to
for by a resource consent or a rule in a
regional plan, or it falls within some particular categories set out in Section 14.
GPL holds water abstraction permit 5384-2 to take groundwater from the
Matemateaonga Formation for use in enhanced hydrocarbon recovery activities at the
Kaimiro-O wellsite. This permit was first issued by the Council on 18 September 1998
under Section 87(e) of the RMA. It was renewed during the monitoring period, on 24
July 2014. It is due to expire on 1 June 2032.
Regional Policy Statement for Taranaki 2010
Freshwater ecological monitoring report 2016-2017
TRC Annual Report 2020/2021
Taranaki Regional Council meeting agenda February 2021 - Part 1
or divert any water, unless the activity is
expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular
categories set out in Section 14.
Contact Energy holds two consents for the abstraction and use of water in relation to SPS.
Water Permit 4455-1 allows the take and use of up to 19,440 m3/day (225 L/s averaged over 15 minutes) of
water on a continuous basis from the Patea River for use of power stations. This permit was originally
unless the activity is expressly allowed for by a resource consent or a rule in a
regional plan, or it falls within some particular categories set out in Section 14.
Contact Energy Limited holds two consents for the abstraction and use of water in
relation to SPS.
Water Permit 4455-1 allows the take and use of up to 19,440 cubic metres/day (225
litres/second averaged over 15 minutes) of water on a continuous basis from the
Patea River for use of power stations. This permit was originally
Trustpower Patea Hydroelectric Power Scheme consent monitoring report 2018-2019
for by a resource consent or a rule in a regional plan, or it falls within some particular
categories set out in Section 14.
Water permit 5437-3 covers the take and use of water from the Waingongoro River for stock drinking, yard
wash down and miscellaneous purposes. This permit was issued by the Taranaki Regional Council on 7 July
2012 under Section 87(d) of the RMA. It is due to expire on 1 June 2029. The review condition was exercised