Your search for 'rain fall' returned 1967 results.

RKM Piggery Annual Report 2022-2023

Again odour was very minimal. No visual environmental impacts downstream of the discharge point to the Tawhiti Stream observed at any time during the financial year. Effluent collection points within piggery viewed during all inspections. Found to be in good condition, with no signs of spills or overflows even after heavy prolonged rain periods. Bunding functioning well. During the 8th May inspection a burst underground effluent pipe between the southern sheds was brought to the attention

Agenda

a primary contact site or falls within other specified rivers or lakes. The NPS-FM also anticipates that the quality of freshwater is to be improved so that it is suitable for primary contact more often. More detail on the swimmability targets and what these mean for Taranaki will be presented to the Committee on the day. Basically where there are grazing animals, particularly dairy cows, and it rains reasonably frequently causing pasture runoff, the new standards will not be met

Consents and Regulatory Committee Agenda August 2022

the NPS- FM objective. Given that the Council can only consider policies that relate to the matters over which the Council has reserved control through the plan itself, the Council is unable to take into account matters that fall outside this scope. You will be aware that, with few exceptions, when a dairy consent involving a discharge to water is replaced, the Council only allows the water discharge to continue until 1 December 2022, then the only discharge allowed is to land.

Future of Transport Consultation Report - July 2023

enough, the climate needs more. The availability of e bikes can bring this down further. We are a hardy bunch in Taranaki, a bit of rain and some hills shouldn't stop us. Level of agreement with proposed active travel goal Survey question: Is a proposal to double the number of journeys by walking, cycling or other active travel to school and work by 2033 ambitious or not ambitious enough? page FRODO 3160950 Figure 7 Online survey: level of agreement to doubling

Pātea Beach green waste monitoring 2017-2018

monitoring period, issues were found with unacceptable wastes being exposed by coastal erosion. This resulted in the site being closed to the public in 2017. Any further dune stabilisation will be done using green waste disposed of at the Patea transfer station. Patea Beach is an elevated site which for most of the time is dry. Rain that does fall on the site drains away at a very rapid rate. The site does not suffer from flooding from rain or tidal action, due to its elevation. Monitoring over

Annual report 2012-2013

NPDC Inglewood oxidation ponds consent monitoring report - Taranaki Regional Council.

Consents and Regulatory Committee Agenda March 2022

104A of the Resource Management Act). Rules 35 and 36 of the RFWP do not include any matters of control that expressly allow for the consideration of matters such as those expressed in the NPS-FM objective. Given that the Council can only consider policies that relate to the matters over which the Council has reserved control through the plan itself, the Council is unable to take into account matters that fall outside this scope. R2/10979-1.0 Commencement Date: