was to be scraped in places and new
metal laid. The ring drains were dry. The grasses in the ring drain were covered in fine silt. The flare pit was
damp and staff advised that works were scheduled to remove sediment from the base of pit so rain water
could freely drain to the ring drain. Drip trays and bunds were in use and all drums were bunded. A spill kit
was observed to be in place. The site was dry and a few stains were noted around the site. A sample from
the second skimmer pit was
NPDC landfills consent monitoring report 2019-2020
STDC lclosed andfills consent compliance monitoring report 2020-2021
the manner in which they will undertake them”. The
LGA currently underpins biosecurity activities through
the collection of both general and targeted rates.
While planning and delivering pest management
objectives could fall under the powers and duties of
the LGA, accessing legislation focused on managing
pests at the regional level is the most transparent and
efficient approach. The Council is mandated under
s11(b) of the LGA to perform the funding function, and
C Boyd drilling waste disposal consent monitoring report - Taranaki Regional Council.
pilot flare was
evident with no odours or smoke. There was smoke noted from the fire training area,
but it was of short duration. Significant riparian planting was being undertaken and silt
control measures were placed in effective positions. No contaminants were apparent in
the stormwater system. Resident invertebrates were indicative of a healthy
environment. Everything was satisfactory.
8 January 2014
The site was inspected after persistent rain. It was not raining at the time of
(11) of the LTMA, if the area of a territorial authority falls into the
regions of more than 1 regional council, the territorial authority must decide (after consulting the
relevant regional councils) which regional transport committee to join.
11. As the Stratford District falls within both the Taranaki Region and the Manawatū-
Whanganui Region, the Stratford District Council therefore must decide which Regional
Transport Committee will represent it for regional land transport planning …
Kupe Production Station resource consent monitoring report 2020-2021
Ample Group resource consent monitoring report 2020-2021