Todd Generation Junction Road Power Station Annual Report 2020-2021
Todd Generation Junction Road Power Station Annual Report 2020-2021
Todd Generation Junction Road Power Station Annual Report 2020-2021
Greymouth Petroleum Ltd Turangi B Hydraulic Fracturing Monitoring Programme Report 2021 2023
Item 7 - Further Submissions on the Proposed Coastal Plan
Further-submissions-on-the-Proposed-Coastal-Plan
are presented in Table 2 and the sampling sites are shown in Figure 1. These sites were chosen because they provide safe access to the stream during periods of rain and are outside of the discharge mixing zone. The stretch of the Piakau Stream between these two points has very high, steep banks which would not permit easy escape in the event of rising waters. The results indicate that the discharge was not affecting the water quality of the Piakau Stream and was in compliance with all
NPDC Inglewood oxidation ponds consent monitoring report - Taranaki Regional Council.
Consents & Regulatory Committee agenda November 2021
BTW Wellington landfarm resource consent monitoring report 2019-2020
Westside Ltd Rimu Production Station monitoring report 2018-2019Rimu PS monitoring report 2018-2019
Response to marine oil spill - Okato 2007.