Your search for 'rain fall' returned 1974 results.

Annual report 2015-2016

NPDC wastewater treatment plant consent monitoring report - Taranaki Regional Council.

Port Taranaki industries consent monitoring 2017-2018

exports were at a record high, with 622,814 freight tonnes leaving over the wharves, compared with 421,592 freight tonnes in 2016-2017, 357,885 freight tonnes in 2015-2016 and 209,100 freight tonnes in 2014-2015. Historically, the move to bulk cargo resulted in an increase in material deposited on the ground in the log and coal storage areas. When it rained this material would wash into the stormwater system, resulting in high suspended solids. In order to minimise deleterious effects on the

Shell Taranaki Maui production station consent monitoring 2017-2018

with weeds and sediment removed. Fresh water biota was evident in the stream indicating good water quality. No flaring, smoke, or off site odours were noted. 8 November 2017 The wind was very strong at the time of the inspection and rain had fallen overnight. Ring drains and bunds were clear and the discharge from the sewage ponds was not causing any effect in the stream. The fire water pond was clear. Minimal flaring was being undertaken and no odours or smoke were evident.

Todd Energy Aquatic Centre monitoring 2019-2020

I Resource consents held by NPDC (For a copy of the signed resource consent please contact the TRC Consents department) page Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are …