heavy prolonged rain.
The cap was walked, and the stormwater drains were checked. It was found
that there was no slumping or cracking, and only some minor insignificant
ponding, which shows that the stormwater drains are currently effective given
the amount of rain prior to the inspection. Although a culvert on the western
boundary and the culverts at the nib wall were partially obstructed, at the time
of inspection, there was no ponding evident as a result. There was good grass
cover, and it
Port area industries resource consent monitoring report
Fonterra Kapuni consent monitoring report 2018-2019
Waste Remediation Services WRS Ltd Symes Manawapou Landfarms Annual Report 2022-2023
Tawhiti Catchment Monitoring Programme Annual Report 2022-2023
Greenfern Hydro Scheme Monitoring Programme Annual Report 2021-2022
Transport Agency.
9. Each representative has an alternate that attends in the absence of the representative.
Stratford District to remain with Taranaki for transport matters
10. As required by Section 105 (11) of the LTMA, If the area of a territorial authority falls into
the regions of more than 1 regional council, the territorial authority must decide (after consulting
the relevant regional councils) which regional transport committee to join.
11. As the Stratford District falls
NPDC New Plymouith wastewater treatment plant consent monitoring report 2018-2019
Future directions for pest management in Taranaki (2013).
Innovation
and Employment (MBIE) is the primary regulator of well integrity, this Council should not
duplicate this function.
The potential environmental effects associated with oil and gas operations that fall within the
Council’s functions (outlined in the Resource Management Act 1991 (RMA)) primarily relate to
impacts on surface water, groundwater, soil and air.
The Council has learnt from its experiences, and has adapted and maintained a watching brief in
respect of