for by a resource consent or a rule in a regional plan, or it falls within some particular
categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council
under Section 87(d) of the RMA.
Water discharge permits
Section 15(1)(a) of the RMA stipulates that no person may discharge any contaminant into water, unless the
activity is expressly allowed for by a resource consent or a rule in a regional plan, or by national regulations.
Permits …
estuaries are well flushed, with little diversity in the way of intertidal and subtidal habitats.
Sedimentation has a major influence on the region’s estuaries, the factors behind which
include rain fall and modified land use. The large number of rivers and the erosion of
Mount Taranaki generally bring a lot of sediment to the coast. However, the high energy
coastline means this sediment supply does not settle long enough to greatly assist with
the beach building process.
Active
Todd Energy Limited Deep Well Injection Annual Report 2023-2024
Report 1992-1993.
Technical Report 93-8.
page
Appendix I
Resource consents held by
STDC
(For a copy of the signed resource consent
please contact the TRC Consents department)
page
Water abstraction permits
Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is
expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular …
Disability
Information
Centre
1 1
If the East Stand is to be altered, the accessible seating, could they be installed in a less exposed area as when it rains from the west, the seating is very exposed to the weather (rain).
50 Emma Salmon 1 1 1
We need a multi sports facility as our current one is outdated. More people play other sports than rugby in Taranaki so it would be more beneficial for our community than upgrading Yarrow
stadium to only house rugby.
remotely by Trustpower. Through an automated water level
sensor system, Trustpower can monitor the residual flows in the Manganui River and Mangaotea Stream,
water levels in the race and lake and how much rain is falling locally. This has allowed Trustpower to manage
race flows to minimise flooding, and has greatly improved Trustpower’s compliance with residual flow
requirements.
1.3 Resource consents
Trustpower holds 23 resource consents the details of which are summarised in the table below
STDC landfills consent monitoring report 2017-2018
STDC landfills consent monitoring report - Taranaki Regional Council
Manawa Energy Mangorei HEP Annual Report 2022-2023