Freshwater physicochemical monitoring 2016-2017
Freshwater physicochemical environmental monitoring report 2016-2017
Freshwater physicochemical environmental monitoring report 2016-2017
heavy rain in August 2022, several rivers were affected with the Waitara sitting about 1m below the stop banks at its peak. Support was provided to several families due to localised flooding. Taranaki Civil Defence Emergency Management Joint Committee - Quarter 2 Performance Report 26 page Performance Report 6 Section 1 | Budget Performance Operational and Capital budget performance is reported for TEMO, funded under apportionment arrangements by the
a regional plan, or it falls within some particular categories set out in Section 14. The Company holds water permit 1795-4 to cover the taking of water from the Waiaua River in association with the Opunake hydroelectric power scheme. This permit was issued by the Council on 13 October 2006 under Section 87(d) of the RMA. It is due to expire on 1 June 2018. Special condition 1 defines the maximum rate of abstraction (3,900 L/s). Special condition 2 requires the Company to
Greenfern Hydro Scheme Annual Report 2022-2023
process sewers which flow to the storm pond. The stormwater falling on the non-process areas of the western half of the site (Figure 1) is directed by “v” ditches running alongside the roads to a dam known as the Duck Pond and then out to the Tasman Sea via the Manu Stream. Stormwater falling on the eastern side of the site is directed to unnamed tributaries of the Waihi Stream via outfalls and a small sedimentation pond. Sludge from the storm pond, off-spec pond and blow down pond stored in
Mangati catchment consent monitoring report - Taranaki Regional Council.
for the purpose of maintaining the Opunake hydroelectric scheme intake 21 March 2001 No reviews remaining 1 June 2018 1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. The Company holds water permit 1795-4 to cover the taking of water from the
a regional plan, or it falls within some particular categories set out in Section 14. The Company holds water permit 1795-4 to cover the taking of water from the Waiaua River in association with the Opunake hydroelectric power scheme. This permit was issued by the Council on 13 October 2006 under Section 87(d) of the RMA. It is due to expire on 1 June 2018. Special condition 1 defines the maximum rate of abstraction (3,900 L/s). Special condition 2 requires the Company to
activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. The Company holds water permit 1795-4 to cover the taking of water from the Waiaua River in association with the Opunake hydroelectric power scheme. This permit was issued by the Council on 13 October 2006 under Section 87(d) of the RMA. It is due to expire on 1 June 2018. Special condition 1 defines the maximum rate of abstraction (3,900
yield and order for each REC class, which is influenced by the amount of data (viz. contributing sites) within each class. The REML model does not produce a coefficient of determination that can be used to check of the goodness of fit of the model. However, goodness of fit was assessed using the frequency with which observed yields fall within the mean yield estimated by the model and 95% confidence interval for a class. Loads from streams recommended to be excluded from