Your search for 'rain fall' returned 1983 results.

Agenda

confirm what stage each project is at before a decision can be made about this. Education for active modes (Let’s Go) now falls under Road Safety. The question was raised should road safety promotion still be an itemised project or fall under BAU? It was noted the LED streetlight conversions can be removed from the list with further projects possibly coming out of the SHIP. Some improvements for SH43 have been included under Minor Improvements with DP advising it needs to remain on the Wish

Nitrates in shallow groundwater monitoring 2002-2012

redistributed it as an apron, known as a ringplain. In addition, significant volumes of ash and tephra were deposited on the ringplain area during these successive volcanic events. The drainage capacity of the soils within the ringplain area is variable due to the variations in soil depositional sequence and structure. In different areas of the ringplain the effects of erosional deposition and ash fall can vary. Laharic deposition is more prevalent on the western side of the ringplain,

Offshore Seismic Data Acquisition Permitted Activity Review

regional From the regional perspective, for seismic surveys within the CMA, most regional coastal plans are silent on provisions for the activity, one would suspect because, until recently, no offshore seismic surveys have been proposed for their respective CMAs and hence, at the time of writing the current plans, crystal ball gazing did not extend to that activity. As a consequence, seismic surveys fall within the default categorisation of discretionary or, in some cases,

Stratford water supplies consent monitoring 2019-2020

with chlorine and fluoride for domestic supply before being pumped to a nearby reservoir. The water supply is reticulated to approximately 2,300 separate customers. Filter backwash is discharged via a large pond. The outlet from the pond is an inverted pipe located at the opposite end of the pond from the inlet. The discharge from the pond emerges from a pipe to fall over a small waterfall. At the base of the waterfall the discharged water runs down a natural cobbled channel beneath native …

Trustpower Motukawa Hydro consent monitoring 2018-2019

approximately 300 L/s of the residual flow past the weir (constructed in 2002). The remaining residual flow passes through an old (and mostly ineffective) fish pass on the true left bank of the weir. Much of the scheme is monitored and operated remotely by the Company. Through an automated water level sensor system, the Company can monitor the residual flows in the Manganui River and Mangaotea Stream, water levels in the race and lake and how much rain is falling locally. This has allowed the

Annual report 2013-2014

there were no solid flecks of zinc visible around this stormwater drain. Solid flecks of zinc were visible on both the gravel and concreted areas around the building and galvanized items were laid out around the perimeter of the yard. It was advised that zinc flecks be picked up on a regular basis, particularly when heavy rain was forecast. It was also advised that if the gravel areas around the site were frequently being used to dry items, that this area be concreted to ensure that any flecks