Your search for 'rain fall' returned 1967 results.

Trustpower Motukawa Hydro consent monitoring 2018-2019

approximately 300 L/s of the residual flow past the weir (constructed in 2002). The remaining residual flow passes through an old (and mostly ineffective) fish pass on the true left bank of the weir. Much of the scheme is monitored and operated remotely by the Company. Through an automated water level sensor system, the Company can monitor the residual flows in the Manganui River and Mangaotea Stream, water levels in the race and lake and how much rain is falling locally. This has allowed the

CDEM Joint Committee Agenda March 2023

heavy rain in August 2022, several rivers were affected with the Waitara sitting about 1m below the stop banks at its peak. Support was provided to several families due to localised flooding. Taranaki Civil Defence Emergency Management Joint Committee - Quarter 2 Performance Report 26 page Performance Report 6 Section 1 | Budget Performance Operational and Capital budget performance is reported for TEMO, funded under apportionment arrangements by the

Annual report 2013-2014

there were no solid flecks of zinc visible around this stormwater drain. Solid flecks of zinc were visible on both the gravel and concreted areas around the building and galvanized items were laid out around the perimeter of the yard. It was advised that zinc flecks be picked up on a regular basis, particularly when heavy rain was forecast. It was also advised that if the gravel areas around the site were frequently being used to dry items, that this area be concreted to ensure that any flecks

Taranaki Seismicity Report 2017-18

instability of the volcano since monitoring became possible in 2014. page Confidential 2018 GNS Science Consultancy Report 2018/149 14 Figure 7.1 Locations of GeoNet GNSS sites on and near Mt Taranaki. Sites are labelled by their 4-letter site codes. NPLY is New Plymouth (located on German Hill), PGKH is Kahui Hut and PGNE is North Egmont. The intention is to also install a site at Dawson Falls once redevelopment work planned in that area is completed. Solid lines

Taranaki Seismicity Report 2018 - 2019

(located on German Hill), PGKH is Kahui Hut and PGNE is North Egmont. The intention is to also install a site at Dawson Falls once redevelopment work planned in that area is completed by the Department of Conservation. Solid lines indicate line lengths currently able to be monitored. Dashed lines can be monitored when instruments are installed at Dawson Falls. The base map is from Google Earth. page Confidential 2019 GNS Science Consultancy Report 2019/124 15

Biennial report 2013-2015

the RMA stipulates that no person may take, use, dam of divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Fonterra Limited holds water permit 0302-3 to take and use up to 19,500 m³/day (225 litres/second) of water from the Kaupokonui Stream for cooling water and general purposes associated with lactose manufacturing. This permit was issued by the Council on