Your search for 'rain fall' returned 1997 results.

Regional Transport agenda June 2019

condition and the amount of investment required to return the road to a “reasonable track” standard. One option put forward is to set up a trust as part of the Whangamomona committee, to seek funding. More work to do and no decision as yet.  Plateau carpark is sealed and completed aside from one small drain.  Dawson Falls – an ecological study was done by DOC regarding removing 1,000m2 of bush (formerly a bridleway) in order to realign the road. The Minister has said no. An

Central Greenwaste and Firewood Biennial Report 2020-2022

allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may discharge any contaminant into water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or by national regulations. Permits

Report 2010-2014

the bibliography. page 4 Photo 1 Opunake Hydro Limited scheme on the Waiaua River 1.3 Resource consents 1.3.1 Water abstraction permit Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Opunake Hydro holds water permit 1795-4 to cover the taking of

Annual report 2012-2013

page 11 1.1.9 Irrigation systems In general there are two types of irrigation methods; surface and pressurised. The majority of irrigation systems currently in operation in the province fall in to the pressurised category. Pressurised systems can be further differentiated based on the method of operation and equipment used. A summary of the systems encountered in the region and some of their advantages and disadvantages are summarised below: K-line and long-lateral

Proposed Coastal Plan for Taranaki Updated Interim version incorporaing Environment Court Decisions

sedimentary rock is softer than the laharic material of the ring plain coast. There are a number of small estuaries at the mouths of Taranaki’s larger rivers. These estuaries are well flushed, with little diversity in the way of intertidal and subtidal habitats. Sedimentation has a major influence on the region’s estuaries, the factors behind which include rain fall and modified land use. The large number of rivers and the erosion of Mount Taranaki generally bring a lot of sediment to

STDC Eltham WWTP Annual Report 2022-2023

Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may discharge any