Street during periods of 400 L/sec (a),
600 L/sec (b), and 700 L/sec (c) residual flow releases and daylight
(950 L/sec) generation flow compliance during the 2012-2013 period 20
Figure 7 Water temperature monitoring sites (W1, W5, W7) in the lower
Waiwhakaiho River catchment 23
Figure 8 Aerial location map of monitoring sites 24
Figure 9 Water temperature (°C) in the Waiwhakaiho River (Egmont Village –
SH3 (upper), Hydro Road (centre), and Rimu Street (lower)), for the
period 1 July
Network Roading Classification (ONRC)
It was advised that timing details as to when mapping is available for this is not able to be
confirmed as yet.
Urban KiwiRAP of New Plymouth underway
Max Aves confirmed that ACC are leading an Urban KiwiRAP project on 150kms of urban
streets within New Plymouth.
2. Release of the National Land Transport Programme 2015-2018
• National Land Transport Programme – comparisons against Regional Land Transport
Plan requests
• Funding
place for the period under review; and
• a description of the activities and operations conducted at each site.
Sections 2 -14 each company’s activity is discussed in detail in a separate section.
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its
discharges, a photograph or map showing the location of the activity, and an outline of the matters covered
by the company’s permit/s.
Subsection 2 presents the results of monitoring
monitoring sites though annual programmes;
• the resource consents held by the companies in the Waitaha catchment;
• the nature of the monitoring programme in place for the period under review; and
• a description of the activities and operations conducted at each site.
Sections 2 -14 each company’s activity is discussed in detail in a separate section.
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its
discharges, a photograph or map
Freshwater recreational bathing monitoring report - Taranaki Regional Council.
Taranaki By-Products Ltd consent monitoring report - Taranaki Regional Council.
Pest Control Guidelines Northland 2015 - NZ Landcare Trust
4 of resource consent 9377-1 with site specific maps which cover all
onshore sites that they operate. The contingency plan has been reviewed and
approved by officers of the Council.
2.5 Investigations, interventions and incidents
The Council operates and maintains a register of all complaints or reported and
discovered excursions from acceptable limits and practices, including non-
compliance with consents, which may damage the environment. The Unauthorised
Incident Register (UIR)