2015-2017 monitoring period 67
Table 30 Summary of compliance with consent 5002-2 over the 2015-2017 monitoring period 70
Table 31 Summary of compliance with consent 9570-1 over the 2015-2017 monitoring period 74
Table 32 Summary of compliance with consent 9972-1.2 over the 2015-2017 monitoring period 74
List of figures
Figure 1 Reporting cycles for both combined quarry groups 1
Figure 2 Map showing monitored quarrying locations in Taranaki 5
Figure 3 AA Contracting Ltd
groundwater concentrations in relation to New Zealand Drinking
Water Standard limits during the 2011- 2013 monitoring period at Surrey
Road stockpiling facility 35
Figure 10 Total dissolved solids groundwater concentrations during the 2011- 2013
monitoring period at Surrey Road stockpiling facility 35
Figure 11 Aerial photo displaying the biomonitoring sites in an unnamed tributary
of the Mangatengehu Stream 37
page
v
Figure 12 Aerial map of the extent of Colin Boyd's
activities.
As part of applying the NZ Transport
Agency’s required Business Case Approach,
a number of stakeholder Investment Logic
Mapping (ILM) workshops were held
throughout the region for specific transport
projects and Asset/Activity Management
Plans.
2) An effective, efficient and
resilient land transport
system that enhances
economic wellbeing,
growth and productivity
in the Taranaki region
and beyond.
All maintenance and improvements
Greymouth Petroleum deep well injection resource consent compliance monitoring report 2020-2021
7
Table 4 Surface water monitoring site details 8
Table 5 Results of groundwater sampling carried out in relation to the Radnor-2 fracturing event 10
Table 6 Results of hydraulic fracturing fluid sampling 11
Table 7 Results of hydraulic fracturing return fluid sampling 12
Table 8 Summary of performance for consent 10348-1 15
List of figures
Figure 1 Location map 5
page
1
1 Introduction
1.1 Compliance monitoring programme reports and
in relation to the Kowhai-5 fracturing event 10
Table 6 Results of hydraulic fracturing fluid sampling 12
Table 7 Results of hydraulic fracturing return fluid sampling 12
Table 8 Summary of performance for consent 10297-1 15
List of figures
Figure 1 Location map 5
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report outlines and discusses the results of
Regional Land Transport Plan monitoring report 2015-2016
Regional Land Transport Plan for Taranaki Annual monitoring report 2015-2016
Table 6 Results of hydraulic fracturing fluid sampling 14
Table 7 Results of hydraulic fracturing return fluid sampling 15
Table 8 Summary of performance for Consent 9418-2 18
List of figures
Figure 1 Location map 5
Figure 2 Monitoring sites at the Turangi-C wellsite 8
page
1
1. Introduction
1.1. Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1. Introduction
This report outlines and discusses the
GND2360 in relation to the
Mangahewa-C fracturing event compared to baseline 16
Table 6 Results of hydraulic fracturing fluid sampling 18
Table 7 results of hydraulic fracturing return fluid sampling 19
Table 8 Summary of performance for consent 7971-2 22
Table 9 Evaluation of environmental performance over time 24
List of figures
Figure 1 Location map 5
Figure 2 Groundwater monitoring sites 9
Figure 3 Surface water monitoring sites 10
page