Kapuni gas treatment plant monitoring 2019-2020
Todd Kapuni gas treatment plant resource consent monitoring report 2019-2020
Todd Kapuni gas treatment plant resource consent monitoring report 2019-2020
outcome for this site? at the end of this season? at the end of next season? a couple of years from now? 50 years from now? Look around your neighbourhood, you may see established sites that will give you ideas. Get maps and aerial photos of the site off Taranaki Regional Council’s Xplorer site. In addition, note: What direction does your site face? What are the moisture levels? Some parts may be wet or damp, while others are dry. Is it exposed to
you may see established sites that will give you ideas. Get maps and aerial photos of the site off Taranaki Regional Xplorer www.trc.govt.nz/taranaki-regional-xplorer. In addition, note: What direction does your site face? What are the moisture levels? Some parts may be wet or damp, while others are dry. Is it exposed to wind/ frost/ salt? What parts are sunny? What parts are shady? Is it flat or steep? Does it have difficult slopes? What kind of soil does it
place for the period under review; and • a description of the activities and operations conducted at each site. Sections 2 -14 each company’s activity is discussed in detail in a separate section. In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its discharges, a photograph or map showing the location of the activity, and an outline of the matters covered by the company’s permit/s. Subsection 2 presents the results of monitoring
Network Roading Classification (ONRC) It was advised that timing details as to when mapping is available for this is not able to be confirmed as yet. Urban KiwiRAP of New Plymouth underway Max Aves confirmed that ACC are leading an Urban KiwiRAP project on 150kms of urban streets within New Plymouth. 2. Release of the National Land Transport Programme 2015-2018 • National Land Transport Programme – comparisons against Regional Land Transport Plan requests • Funding
Street during periods of 400 L/sec (a), 600 L/sec (b), and 700 L/sec (c) residual flow releases and daylight (950 L/sec) generation flow compliance during the 2012-2013 period 20 Figure 7 Water temperature monitoring sites (W1, W5, W7) in the lower Waiwhakaiho River catchment 23 Figure 8 Aerial location map of monitoring sites 24 Figure 9 Water temperature (°C) in the Waiwhakaiho River (Egmont Village – SH3 (upper), Hydro Road (centre), and Rimu Street (lower)), for the period 1 July
monitoring sites though annual programmes; • the resource consents held by the companies in the Waitaha catchment; • the nature of the monitoring programme in place for the period under review; and • a description of the activities and operations conducted at each site. Sections 2 -14 each company’s activity is discussed in detail in a separate section. In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its discharges, a photograph or map
Freshwater recreational bathing monitoring report - Taranaki Regional Council.
Taranaki By-Products Ltd consent monitoring report - Taranaki Regional Council.