2015-2017 monitoring period 67
Table 30 Summary of compliance with consent 5002-2 over the 2015-2017 monitoring period 70
Table 31 Summary of compliance with consent 9570-1 over the 2015-2017 monitoring period 74
Table 32 Summary of compliance with consent 9972-1.2 over the 2015-2017 monitoring period 74
List of figures
Figure 1 Reporting cycles for both combined quarry groups 1
Figure 2 Map showing monitored quarrying locations in Taranaki 5
Figure 3 AA Contracting Ltd
groundwater concentrations in relation to New Zealand Drinking
Water Standard limits during the 2011- 2013 monitoring period at Surrey
Road stockpiling facility 35
Figure 10 Total dissolved solids groundwater concentrations during the 2011- 2013
monitoring period at Surrey Road stockpiling facility 35
Figure 11 Aerial photo displaying the biomonitoring sites in an unnamed tributary
of the Mangatengehu Stream 37
page
v
Figure 12 Aerial map of the extent of Colin Boyd's
Greymouth Petroleum deep well injection resource consent compliance monitoring report 2020-2021
activities.
As part of applying the NZ Transport
Agency’s required Business Case Approach,
a number of stakeholder Investment Logic
Mapping (ILM) workshops were held
throughout the region for specific transport
projects and Asset/Activity Management
Plans.
2) An effective, efficient and
resilient land transport
system that enhances
economic wellbeing,
growth and productivity
in the Taranaki region
and beyond.
All maintenance and improvements
7
Table 4 Surface water monitoring site details 8
Table 5 Results of groundwater sampling carried out in relation to the Radnor-2 fracturing event 10
Table 6 Results of hydraulic fracturing fluid sampling 11
Table 7 Results of hydraulic fracturing return fluid sampling 12
Table 8 Summary of performance for consent 10348-1 15
List of figures
Figure 1 Location map 5
page
1
1 Introduction
1.1 Compliance monitoring programme reports and
in relation to the Kowhai-5 fracturing event 10
Table 6 Results of hydraulic fracturing fluid sampling 12
Table 7 Results of hydraulic fracturing return fluid sampling 12
Table 8 Summary of performance for consent 10297-1 15
List of figures
Figure 1 Location map 5
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report outlines and discusses the results of
Regional Land Transport Plan monitoring report 2015-2016
Regional Land Transport Plan for Taranaki Annual monitoring report 2015-2016
L/s residual flow (2002-2020),
previous period (2020-2021), and current year (2021-22) 20
Figure 9 Manganui River water temperature differences between sites upstream and downstream of the
Motukawa HEP weir compared with the flow in the Manganui River at Everett Park from 8
November to 8 December 2018 21
Figure 10 Map showing sampled sites with current survey results 22
page
iv
Figure 11 Cumulative weight of elvers transferred from the Motukawa Power Station
Table 6 Results of hydraulic fracturing fluid sampling 14
Table 7 Results of hydraulic fracturing return fluid sampling 15
Table 8 Summary of performance for Consent 9418-2 18
List of figures
Figure 1 Location map 5
Figure 2 Monitoring sites at the Turangi-C wellsite 8
page
1
1. Introduction
1.1. Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1. Introduction
This report outlines and discusses the