Annual report 2013-2014
JD Hickman transport depot consent monitoring report - Taranaki Regional Council.
JD Hickman transport depot consent monitoring report - Taranaki Regional Council.
McKechnie Aluminium Solutions consent monitoring report - Taranaki Regional Council.
included in the monitoring programme 8 Table 5 Results of groundwater sampling carried out in relation to the Turangi-B fracturing events 10 Table 6 Results of hydraulic fracturing fluid sampling 15 Table 7 Results of hydraulic fracturing return fluid sampling 15 Table 8 Summary of performance for consent 7952-2 18 Table 9 Evaluation of environmental performance over time) 19 List of figures Figure 1 Location map 5 page 1 Introduction Compliance monitoring
the river. 107. Mr Auld reiterated that access for recreational users will continue to be provided if safety aspects are complied with. He also noted that this dam has a unique feature where the weir can be easily accessed by river users, unlike other hydro-electric schemes where the weir is fenced off. This weir has been available for use and will continue to be available under the proposed hydro-electric scheme. 108. Mr Auld reiterated that Iwi values are recognised by the applicant
map showing the location of the soil samples; • The nitrogen budget outlining all input and output quantities and qualities; • A record of any complaints received about the discharge; • The results of any self- compliance assessment; and • Any remedial measures taken by ANZCO in relation to any complaints received or any potential non- compliance. Annual complianc e report will be prepared and provided to TRC by the 30th October each year.
Location Site code Map Reference 1 Urenui River SH3 bridge URN000420 1721404 - 5682968 1a Urenui River Footbridge URN000440 1720608 - 5682914 2 Urenui River at mouth URN000480 1720245 - 5683370 3 Sea coast approx. 200 m east of river mouth SEA900072 1720582 - 5683563 4 Sea coast at east end of beach SEA900070 1720803 - 5683667 The bridge on State Highway 3 (Site 1) had previously been used as the upstream sampling site, however, this site is no longer safe to sample from. The
Stratford Power Station 24 page iv Figure 10 Location of biomonitoring sites in the Pātea River in relation to the power station discharge of cooling water and water abstraction with taxa number, MCI scores and SQMCI scores for each site 25 Figure 11 Location of biomonitoring sites in the Pātea River in relation to the power station discharge of cooling water and water abstraction with taxa number, MCI scores and SQMCI scores for each site 26 Figure 12 Map showing
quarry groups ‘A’ and ‘B’ 1 Figure 2 Map showing monitored quarrying locations in Taranaki 6 Figure 3 Bunn Earthmoving Limited quarry site 13 Figure 4 Burgess & Crowley Partnership East Road quarry site 17 Figure 5 C D Boyd Surrey Road quarry site 22 Figure 6 DM & DL Bourke Onewhaia Road quarry site 26 Figure 7 Hey Trust Monmouth Road quarry site 31 Figure 8 Horizon Trust Management Limited Rangitatau West Road quarry site 35 Figure 9 Horizon Trust Management Limited
Todd McKee production station & power plant consent monitoring report - Taranaki Regional Council.
Fonterra Kapuni consent monitoring report 2017-2018